Wholesale Sectional used 16x7 8x7 cheap garage doors modern design overhead garage doors

Share on (1601075984529):


Price:$123.00 - $145.00

Quantity:


Product Overview

Description





Product Description






Product Name:
Aluminum garage door
Open style:
Automatic,Manual, Sectional roll up sliding
Door panel material:
Aluminum with insulation foam filled
Hardware/Track:
Quality galvanized steel or Stainless steel hardware
Opener Motor:
Tension: 600N/800N/1000N/1200N base on different door size
Glass:
Temperef Insulated Glass:5+9A+5/5+12A+5/5+16A+5,etcLaminated Glass:6.38mm,8.38mm,8.76mm,10.76mm,etc
Type:Low–E/Reflective/Tempered/Floated/Coated
Color:
White/black/grey/brown/champagne/silver
(special colors available according to customer requirement)












Recommend Products




Company Profile








FAQ

Q: Are you a factory or Trading company?
Topbright established in 2012, with 3 production bases, a total of 300,000 Square feet, a window door, and Curtain wall manufacturing factory which located in Guangzhou, where the city held the Canton fair twice a year. A warm welcome to visit our company, just 45-minute drive from the Airport.

Q: Can we use our own door design?
A: Yes, Topbright offers the design-built-ship-install guide service, for commercial project customers and dealers. Based on the project's local situation, our engineering team designs the product with fix solution to meet the project’s requirement, from drawing to production, Topbright covers you all.

Q: Where is your factory located and how can I visit you?
A: We are located in Guangzhou city. After you arrive at Guangzhou airport, we can pick you up there.

Q: What information is needed to order parts for my product?
A: It is important to have as much detailed information as possible. Proper measurements for sash/panel replacement, as well as your product series number are necessary for us to place an order for you. If needed, visual aides, such as emailing pictures of your product, can also be of assistance.

Q: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 45 days for producing.



0.1924 s.