Portable handheld spray gun sandblasting machine/Dustless blasting/sandblaster

Share on (1601079969314):


Price:$1,000.00 - $5,000.00

Quantity:


Product Overview

Description





Products Description









DB150
♦1 Cubic foot capacity (28L)
♦ About 15 minutes blast time per fill
♦ Operating pressure: 30-150PSI
♦ Tank dimensions:1067*584*533mm
Includes:
♦ Dustless blasting pot
♦ 15m blast hose
♦ Nozzle head shut off valve
♦ Spray nozzle(Tungsten Carbide nozzle)
♦ Fill funnel with screen
♦ Lifetime warranty on blast pot
♦ Weight : 72kgs





DB225
♦2 Cubic foot capacity (57L)
♦ About 30 minutes blast time per fill
♦ Operating pressure: 30-150PSI
♦ Tank dimensions:1397*660*863mm
Includes:
♦ Dustless blasting pot
♦ 15m blast hose
♦ Deadman Activator Valve
♦ Spray nozzle(Tungsten Carbide nozzle)
♦ Fill funnel with screen
♦ Lifetime warranty on blast pot
♦ Weight : 120kgs





DB500
♦5 Cubic foot capacity (143L)
♦ About 60 minutes blast time per fill
♦ Operating pressure: 30-150PSI
♦ Tank dimensions:1397*914*1016mm
Includes:
♦ Dustless blasting pot
♦ 15m blast hose
♦ Deadman Activator Valve
♦ Spray nozzle(Tungsten Carbide nozzle)
♦ Fill funnel with screen
♦ Lifetime warranty on blast pot
♦ Weight : 167kgs


Details Images












Air Tube
We adopt metal skeleton rubber material high-pressure air tube, it can withstand 25Mpa pressure , anti-aging, long life,not easy
to damage, not necessary for regular replacement. Fixed with bolts, not easy to fall off, to ensure sealing effect.
Surface Preparation
Our painting work is done in special painting room, then high temperature solidification after painting with high temperature,
paint adhesion is strong, not easy to fall off. High surface finish degree, not easy to change color, beautiful and durable.


Product packaging


Size DB225
950(L) * 820 (W) * 1500 (D)
Weight

210 kg
Packaging Details
The normal package is wooden box(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is
too tigher,we will use pe film for packing or pack it according to customers special request.


Application




Company Profile


Company profile:
Qingdao Rovan Machinery Co., Ltd. was established in 2001, intergrated scientific research, design, manufacture, debugging installation consulting service professional equipment manufacture enterprises.
The company has always been adhering to the ‘win-win’ business purposes, to provide customers with quality products and services while focusing on self-construction, introduced ISO9001 quality management system, and built a 100 highly qualified employee to be strong backing.
The company mainly produces dustless blasting and shot blasting machine, the products are mainly for shipbuilding, the tire manufacture and the road shot blasting machine, mobile shot blasting machine and other special equipment.



Why Choose Us


WHY US?
1.19 years of basic experience.
2.Management team: we have employ the foreign export to take change of the overall management, especially the technical management and quality management.
3.Introducing ISO management, we have passed ISO 9001:2008 certificate.
4.Lofting and design software: we have special blasting design software which can help us design all kinds of shot blasting machine, at the same time, the SANY and VOLKS are adopted by us to provide the design the drawing accurately.
5.QC Inspection: it is our company policy that all the finish product should be inspected by our specialized QC in every manufacture steps and before every shipment.
6.We are always persisting in rigorous cooperation with domestic senior highly qualified team working at R&D, manufacture, QC, after-sale service and other important positions.


Customer Photos




Our service


FAQ:
Q1. What is your terms of packing?
A: Generally, we package our goods in wooden cases.

Q2. What is your terms of payment?
A: 100% by alibaba trade assurance by VISA or T/T.
B: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB,CIF, DAP

Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

Inquiry Now-Give you big discount !!!
Welcome to send inquiry to us now , we have promotion now !


0.2101 s.