Full Automatic xgf18186 80 bpm Mineral Water Filling Machine for Water Bottling Line

Share on (1601080170170):


Price:

Quantity:


Product Overview

Description



Full Automatic xgf18186 80 bpm Mineral Water Filling Machine


Products Description


Full Automatic Complete Pet Plastic Small Bottle Pure Drinking Mineral Water Production Line/mineral water bottle filling machine/filling machines automatic bottle/bottle filling and labeling machine/
Bottled water machine plant machinery:

1. (Making bottles) Automatic bottle blowing machine or Semi automatic bottle blowing machine.
2. (Water purification system) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into the bottle) Bottle washing filling and capping machine.
4. (Printing the date on the bottled water) CO2 laser date printing machine.
5. (Labeling bottled water) Shrink sleeve labeling machine or Sticker labeling machine.
6. (Package the bottled water) Automatic PE film shrink wrapping packing machine or Semi automatic PE film shrink wrapping packing
machine / Carton box packing machine.


Choose your production output per hour:
CGF 12-12-1 Bottle Washing Filling Capping Machine, 1000-2000 bottles per hour.
CGF 8-8-3 Bottle Washing Filling Capping 3-in-1 Machine, 2000-3000 bottles per hour.
CGF 12-12-5 Bottle Washing Filling Capping 3-in-1 Machine, 3000-4000 bottles per hour.
CGF 16-12-6 Bottle Washing Filling Capping 3-in-1 Machine, 4000-5000 bottles per hour.
CGF 18-18-6 Bottle Washing Filling Capping 3-in-1 Machine, 5000-6000 bottles per hour.
CGF 24-24-8 Bottle Washing Filling Capping 3-in-1 Machine, 8000-10000 bottles per hour.
CGF 32-32-10 Bottle Washing Filling Capping 3-in-1 Machine, 12000-15000 bottles per hour.
CGF 40-40-12 Bottle Washing Filling Capping 3-in-1 Machine, 16000-18000 bottles per hour.








Bottled water plant machinery:
1. (Making bottles) Automatic bottle blowing machine or Semi automatic bottle blowing machine.
2. (Water purification system) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into the bottle) Bottle washing filling and capping machine.
4. (Printing the date on the bottled water) CO2 laser date printing machine.
5. (Labeling bottled water) Shrink sleeve labeling machine or Sticker labeling machine.
6. (Package the bottled water) Automatic PE film shrink wrapping packing machine or Semi automatic PE film shrink wrapping packing machine / Carton box packing machine.




Main Technical Parameters


Item
CGF12-12-1
CGF8-8-3
CGF16-12-6
CGF18-18-6
CGF24-24-8
CGF32-32-10
CGF40-40-10
Production Capacity (BPH)
1000-2000
2000-3000
4000-5000
5000-6000
8000-10000
12000-15000
16000-18000
Washing head
12
8
16
18
24
32
40
Filling head
12
8
12
18
24
32
40
Capping head
1
3
6
6
8
10
10
Main motor power (KW)
1.0
1.5
2.2
3.5
4.5
6
7.5
Packing size (mm)
2000*1000*1800
2200*1200*2000
2400*1650*2200
2600*1920*2250
3100*2300*2250
3800*2800*2300
4600*2800*2350
Choose or customize the bottles you want:








Details Images




VR


Real Scene Shoots


No.1 Water Production Line on Alibaba.
19 Years Alibaba Verified Gold Supplier.
27 Years Production Experience.
147 Online Transactions Completed.
12,500 Square Meters Standard Factory.
180,000 USD Alibaba Trade Assurance.
1,750,000 USD Online Transaction Volume.
7,800,000 Yuan RMB Registered Capital.
ISO 9001:2008 Quality Management System.
CE Certified & TUV SUD Capability Assessment.


Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Factory Address : No.141 Plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen City, Guangdong Province, China (It is one and a half hours' drive from Guangzhou)




Certification Verified






If you want to know more about our company overview. Pls click VIEW MORE >
27 Years professional design and manufacturing experience.


Transaction History Verified


This supplier has completed 147 Transactions.
Our products are sold well not only in domestic, but also in Chile, Venezuela, Ghana, Kenya, Egypt, Peru, Maldives, United States, Brunei, Darussalam, Saudi Arabia, Panama, Cambodia, Bhutan, Bolivia, Bulgaria, Nicaragua, Dominican Republic, Somalia, Australia, Switzerland, Mozambique and other countries.








FAQ


Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Add: No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, China
Q1. Are you a factory or trading company?
A1. We are a professional water treatment and filling machine manufacturing factory that set up for 27 years.We always pay attention to the development of the industry !.We can give a discount according to the quantity of machine you purchase. (19 years Alibaba Gold supplier)

B1. At the same time,we take effective measures to control the production process for ensuring the quality of products.
Our products are certified.And we can supply SGS, BV, TUV, ISO9001, ISO14001, OHSAS18001, CE certification.

C1,Website: www.fostream.com
Website on alibaba: https://jmangel.en.alibaba.com

Q2. Where is your factory located? How can I visit there?
A2:Our factory is located in No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, China, All our clients, from home or abroad, are warmly welcome to visit us!

Q3. What products does your company offer by yourself?
A3:We are specialized in water treatment machines and small bottle filling machines, 5 gallon water filling machines.
Q4: When can I get my machine after I paid?
A5: Normally production time is around 15 - 25 working days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.

Q5: How long of your warranty?
A6: Regarding warranty, normally we offer 1.5 year warranty, and we also offer lifetime maintenance.
Welcome to China! Welcome to our factory!
(From Guangzhou Baiyun International Airport to our factory need only 85 minutes.)








0.0862 s.