CE20 30 40 50 60 Single Cage Construction Hoist Lift construction lifters construction lifters

Share on (1601102607621):


Price:$21,000.00 - $25,000.00

Quantity:


Product Overview

Description



Product Overview






SC100 150 200/ 200 Construction elevator/hoist
1.the transmission mechanism adopts two-drive or three-drive form, the rack and pinion force is uniform, safe and smooth.
2.To ensure the safe operation of the elevator, safety switches such as overload and speed limit are set in the circuit. When the
above situation occurs in the operation, the elevator will avoid accidents immediately and automatically. Each door on the cage is
also equipped with a limit switch, so that when any door is opened abnormally, the cage cannot start or stop running immediately.
3.Each cage is equipped with fall arrester, which can effectively prevent the cage from falling and ensure the safe and reliable
operation of the elevator.


FEATURES AT A GLANCE





Our Companyfrequency series of construction lifts for the gear, rack drive, the use of advanced technology at home
and abroad, the theory combined with practice, continuous improvement and innovation, reasonable institutions, simple
operation,beautiful appearance.
Models have three drives, two drives. Disassembly is particularly convenient, work more secure.
This product has been updated several times, the performance has been improved and improved




Hoist
The cage frame adopts bending process, all are national standard steel, the cage adopts baking paint process, the body is safe and solid.



Cage bottom plate hot-dip galvanizing process
The cage bottom plate is hot-dip galvanized, which can be maintained for about 50 years without the need for repair; it extends the service life of the equipment very well.




Three drive structure
The motor, reducer low noise, starting, braking smooth, products, institutional components are used in domestic and foreign famous brand manufacturers, can be selected by customers.




Electrical system
The electrical system is the mechanical command part of the elevator, all the movements of the elevator are commanded by the electrical system, which includes the upper electrical box, the lower electrical box and the control cable.
Cage beam
Cage beam is the core part of the cage skeleton, the beam of our products, including the main stress parts (referring to the top and bottom of the cage) are all made of 16# cold-formed channel steel (made of manganese steel), which effectively ensures the service life of the whole machine and sturdiness.


Fall arrester
transportation at the construction site ensures the safe operation of the hoist. Safety switches such as overload and speed limit are set in the circuit so that the hoist will immediately and automatically avoid accidents when the above mentioned situations occur during operation. Each door on the cage is also equipped with a limit switch, so that when any door is opened abnormally, the cage cannot start or stop running immediately
Transmission mechanism
The transmission mechanism components of our construction hoist for vertical transportation at construction sites are adopted by domestic and foreign brand manufacturers, and the motor and reducer have low noise, smooth starting and braking, and are durable. In addition, each motor of our company's transmission mechanism is equipped with motor bracket and motor strap double protection, so as to effectively ensure the smoothness of the motor, reducer operation (especially in the moment of starting, braking), because the motor, reducer operation is smooth, so prolonging the service life of the motor, reducer, gears, racks and so on.
Cage cab

Each cage is equipped with an independent and spacious cab, and the top and bottom of the cab are all welded with a double-layer roof, which effectively avoids the danger of falling debris to the driver's personal safety in the construction process. The operation panel is made of 304 stainless steel, and the lifting switch is made of imported Schneider components, which is durable.


PRODUCT SPECIFICATIONS


Model NO
SC100, SC150, SC200
Lift Mechanism
Articulated Lift
Attendant
With Attendant
Deceleration Device
With Deceleration Device
Elevator Door
Center Opening Door Other
Product Name
SC100 200 200/200 Passenger Material Construction Elevator
Cage Size
3X1.5X2.2m, 3.2X1.5X2.5m, 3.2X1.5X2.8m
Cage Sidewall
Aluminum Alloy
Cage Door
Ramp Door, Sliding Door
Rated Motor Power
3X11kw, 2X15kw, 3X15kw, 2X23kw, 3X23kw
Mast Section
650*650*1508mm, 450*450*1508mm
Power Supply
380V/50Hz, 440V/60Hz, 220V/60Hz
Operation Method
Joystick, Remote, Auto Leveling
Control System
Common Contator / Vfc
Main Electric Compoents
Chinese brand
Main Cable
16sqmm, 25sqmm, 35sqmm, 5 Wire Cores
Coating
Painting Spray, Hot Galvanized
Warranty
1-12months After Shipment
Main Market
South America, Asia, Europe, Africa
OEM Solution
Supported
Transport Package
Seaworth Package
Specification
3.2x1.5*2.5m
Trademark
XYJJ/customizable
Origin
China
HS Code
8428200000
Production Capacity
3000sets / Year




CE approved SC100 150 200/200Passenger Material Construction Hoist Building Lift Architectural Single cage Construction Elevator




Our construction elevator is also called outdoor construction hoist construction lift, which is driven by pinions & racks devices and with safe & comfortable cages. It can lift both construction cargo materials and passengers personnel. It bases on its mast fixed in the ground and attached to the wall, which ensure its safety.


SALES AND SERVICE NETWORK




Projects in Indonesia
Projects in the United States
 Project in Russia


PRODUCT CONFIGURATION






Standard Construction elevator for materials and passengers from 1000kg to 3000kg load.Standard Construction elevator for materials and passengers from 1000kg to 3000kg load.


MAST SECTION
1:The high quality seamlesssteel pipe is good vertically, anti-pressure, anti-aging, thickness and so on), it offer a well
2:rail for cage climbs on.
3:HF high quality tube&pipe
4:Steel plate with high quality, steel plates are bent of U shape to stren-gthen the mast section
5:Mast section with galvanized coat or heat spray coat can be chosen
6:Steel round bar Q235B with high quality and strengthen the mast section
7:Mast section welded by welding Robot ensures reliable quality and elegant appearance.
8:All the steel structures are processed with blasting technology to remove rust.
9:The adhesion of surface painting is outstanding.




Moderate speed materials and passengers Construction elevator


Specification
Model
Load Capacity
Lifiting Speed
Motor Power
VFD
Safety Device




Single cage

SC 100
1000Kg
0~36m/min
0~60m/min
2×11Kw
2x20kw
30Kw
45Kw
SAJ 30-1.2
SAJ 30-1.4
SC 150
1500Kg
0~36m/min
0~60m/min
2×13Kw
2x23Kw
45Kw
55Kw
SAJ 40-1.2
SAJ 40-1.4


SC 200


2000Kg
0~36m/min
0~40m/min
0~54m/min
0~60m/min
0~75m/min
3×11Kw
2x15Kw
2×19Kw
3×15Kw
3×23Kw
37Kw

45Kw
55Kw
90Kw
SAJ 40-1.2
SAJ 40-1.4
SAJ 40-2.0
SAJ 50-1.6




Twin cagesTwin cages
SC100/100
1000Kg×2
0~36m/min
0~60m/min
3x11Kwx2
2×20Kw×2
45Kw
SAJ 30-1.4
SC150/150
1500Kg×2
0~36m/min
0~60m/min
2x13Kwx2
2×23Kw×2
45Kw
55Kw
SAJ 40-1.4


SC200/200


2000Kg×2
0~36m/min
0~40m/min
0~54m/min
0~60m/min
0~75m/min
3x11Kwx2
2×15Kw×2
2x19Kwx2
3×15Kw×2
3×23Kw×2
37Kw

45Kw
55Kw
90Kw
SAJ40-1.2

SAJ 40-1.4
SAJ 40-2.0
SAJ 50-1.6


High speed materials and passengers Construction elevator


Specification
Model
Load Capacity
Lifiting Speed
Motor Power
VFD
Safety device
Single cage
SC 200
2000Kg
0~80m/min
0~96m/min
3×26(87Hz)
3×18.5(87Hz)
90Kw
110Kw
SAJ 50-2.0
Twin cage
SC200/200
2000Kg×2EA
0~80m/min
0~96m/min
2×3×26(87Hz)
2×3×18.5(87Hz)
90Kw×2
110Kw×2
SAJ 50-2.0


VFC Control system: Chinese leading brand




Packing & Delivery






Certifications




Advantage:
1:Over 20 Years'Foreign Trade Experience
2:Rich experience in sea transportation
3:Professional and enthusiastic foreign trade salesman
4:Our core goal is to make excellent products, quantity is our destination.
5: We have a high-caliber after sales team.
6:We engage in good quality and reasonable prices.Our products are cost effective
7:Accepted Delivery Terms: FOB,CIF,EXW
8:Accepted Payment Currency:USD,EUR,JPY,HKD,CNY
9:Accepted Payment Type: T/T


Our Services
pre-sale service
1:Dear friends, before the sale, we will fully understand your needs, according to your machine requirements and your budget,
choose
the right model for you, to ensure that you buy high-quality products at a lower price.
2:At the same time, you are welcome to visit our factory in guangzhou, China, we will book hotels, air tickets and take you to the
scenery of guangzhou in advance.


After-sale service
1:After the sale, we will properly arrange the transportation of the machine to ensure that the goods are safely delivered to
yourhands.
2:At the same time, we will provide you with technical support 24 hours a day, or send engineers to guide the installation and
operation. If there are any quality problems with the machine, we will solve it for you in the first time.







FAQ


Q:How do your prices and quality compare to other suppliers?
A:We are the largest construction machinery manufacturer and supplier in Guangzhou, China We have our own source factory Our
technicians have more than 20 years of manufacturing experience to ensure good quality Source factory first hand supply more
competitive price

Q:HOW IS YOUR DELIVERY TIME?
A:In general circumstance,we can have an immediate delivery of regular machines for our clients within 15days, Because we have our
own source factory and technical team to check machines in stock,locally and nation widely,and to receive machines in timely
manner. But for Other suppliers it will take more than 30 days to produce the ordered machine

Q:HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
A:Our team is consisted of a group of diligent and dynamic people,working 24/7 to respond client inquiries and questions all the
time.Most problems can be solved within 8 hours, while manufacturers/factories will take much longer to give response.

Q:WHICH PAYMENT TERMS CAN YOU ACCEPT?
A:Normally we can work on T/T term or L/C term,sometime D/P term. (1) On T/T term, 30% down payment is required in advance,and
70%balance shall be settled before shipment, or against the copy of original B/L for long-term cooperating client. (2) On L/C
term, a100% irrevocable L/C without (3) Manufacturers/factories adjusted the machine price, because of the increasing labor cost
and rawmaterial cost

Q:WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
A:We can ship construction machinery by various transportation tools1) For 80% of our shipment the machine wil go by sea, to
allmain continents such as Africa, South America, Middle EastOceania and Southeast Asia etc , either by container or
RoRo/Bulkshipment.(2) For inland neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan,
Tajikistan,UzbekistanTurkmenistan etc.. we can send machines by road or railway.3) For light spare parts in urgent demand, we can
send it by intemational courier service, such as DHL,TNT. UPS. or Fedex




















0.1508 s.