The Casting in place baluster mold each piece concluds the uprail, the base and middle baluster, and it need to be assembled where the balustrade should be place in the house , yard or garden. Most of the case the baluster molds will come with the matched pillar molds which can do the closer, corner, middle for connection also decoration. One Matched post or pillar or pedestal can do end,middle, corner, just install the joint part in differen place of the pillar .There are also part can enlong the baluster rail, if there is necessary space need to extend.
Product Presentation
Brush the waste oil in the mold first to ensure good removal of the mold.After the mold is installed, press the lower press line with heavy objects to prevent the mold from floating.
After mixing the sand slurry, start to pour the sand slurry. In the process of pouring, stick is often used to poke the sand slurry to ensure that it is strong
After 24 hours, the mold can be dismantled to self-made dismantling tool button unbuttoning 7-word hook inserted into the foot of the pressure line support mold mouth up and down to pry, can easily 10 to. Take it apart at the top.
Brand name
renfa
Material
plastic
Life time
2-3 years
Height
700mm
Application
balcony, exterior
FAQ
● What about the Minimum Quality Order? -- The MOQ is 5 set. If you order large amount, you will get discount. ● What is the payment terms? -- T/T, L/C, Western Union,credit card. ● Which kind of shipment do you support? -- Sea transportation, air transportation and international express. ● When will you deliver the machine? -- 7-15 workdays after receiving the balance payment. ● Do you supply training and after-sale service? -- Yes, we will supply installation and training on site or online. Also we have a professional service team that can solve problems as fast as possible.