The support and the saw table are placed side by side to cut more stably.
The support is stable, the roller is smooth, and the use is more convenient
The exquisite material with the fine surface technology is beautiful and generous
Folded structure
Easy to expand storage does not take up space.
Height adjustable
Better meet the needs of different heights.
Double roller rail
Increased stability and smoother use.
Gridded foot pads
The grid lines are more tightly held.
Non-slip base
Large width base easy to weigh safe and convenient
Thickened stainless steel
hard and not easy to bend to strengthen the load bearing strength of up to 1500 kg
Product Name
roller conveyor tracks
Material
stainless steel+ABS roller
Type
27 single-row rollers
54 double-row rollers
Stainless Steel Material
Single row size: length 1 m
adjustable height 55-85cm
Number of rollers: single row of rollers 27
Double row size: length 1 m wide 40cm
adjustable height 65-93cm
double row roller 54
Q1. Can you send sample for us?
Yes ,you can buy 1-2 pieces samples for test.We can return sample fee after production order.
Q2. Can you accept small order?
Yes, we can accept trial orders as the beginning of business. And we are also willing to help small start-ups.
Q3. Do you inspect the product? How?
Yes, each step of production and finished products will be inspected by QC before shipment.
Q4: Are you a factory or a trader? A: We are a 20 year source production factory with rich production experience and a total of 8000+customers. We can provide you with thoughtful and accurate after-sales service.
Q5: How should I make the payment? A: Firstly, you will pay a 50% deposit as a prepayment, and then we will start producing the equipment. After the equipment is completed, I will send you photos and videos, and you can make the remaining payment. After receiving all the payment, we will arrange for the fastest container to ship to you. You will receive the equipment soon, and I will arrange professional technicians to coordinate with you regarding installation issues.
Q6: How long is the delivery time? A: common goods takes 10-12 days, customized or other parameters take around 30-45 days.