ELEGE 50KW River and Streams Double jet impact type Water hydro Use Mini Size Turbine Hydroelectric Generators 20kw 30kw

Share on (1601168499696):


Price:$14,000.00 - $14,150.00

Quantity:


Product Overview

Description





1. The tail water pipe can be lengthened to prevent the downstream water level from fluctuating and flooding the generator;
2. Theopen channel water inlet is convenient for installation and the unit is more efficient;
3. The excitation generator has an automatic voltage stabilization version, which can automatically adjust the output voltage to the rated voltage.
4. The excitation generator has automatic voltage stabilizing version, the output voltage is stable without burning electrical appliances;
5.One-piece design is easy to install and transport, with five bearings of hydraulic turbine.


Power/KW
Head/meter
Flow rate m³/s
Tube inner diameter/mm
Suggested head/m
3
10-35
0.008-0.035
≥100
15
5
0.008-0.035
≥150
3
15-50
0.0035-0.015
≥80
25
5
0.007-0.03
≥100
8
0.011-0.047
≥150
10
0.014-0.06
≥150
15
0.021-0.09
≥200
3
20-70
0.0025-0.01
≥50
50
5
0.006-0.024
≥65
8
0.010-0.04
≥80
10
0.012-0.048
≥100
15
0.018-0.072
≥150
20
0.024-0.096
≥150
30
0.036-0.144
≥200
5
50-150
0.003-0.012
≥50
100
8
0.005-0.02
≥50
10
0.006-0.024
≥65
15
0.009-0.036
≥80
20
0.012-0.048
≥100
30
0.018-0.072
≥125
50
0.03-0.12
≥150
100
0.03-0.24
≥200




Installation Procedure: After the unit foundation be poured with concrete is solidified, the unit is installed in place and then watered in sequence. The water level must be measured with a level gauge to ensure that the unit is fixed in a horizontal position. The gap between the unit and the floor should be sealed with cement, and no water seepage is allowed. After the unit is installed, check again and turn the turbine shaft of the turbine by hand. If the machine is flexible, the installation is finished. Installation requirements: The bottom plane of the turbine in close contact with the foundation plane. NOTE: 500w hydro generator only can be used with the following two conditions:. 1) The vertical Water level difference between the unit foundation and the hydro generator must be in this range:7-15M 2) The water flow must can fully fill the water tube that is above 7.5cm diameter all the time.










• Q: Are you a factory?
A: We are the factory/manufacturer so we can control production costs and then sell at the lowest price.
•Q: Can I get some samples?
A: Yes, sample order is available for quality inspection and market testing, it will be freight collect.
• Q: What is the lead time?
A: It usually takes about 1-3 days to produce samples. It usually takes about 3-7 days to
produce the product.
• Q: What is your payment term?
A: We usually accept PAYPAL, T/T as the main payment method, other payment
methods can also be negotiated.
• Q: Quality problem?
A: If there is any quality problem or question, we can provide technical
support or return service.
• Q: How can I contact us?
A: Send your inquiry details below, click "Send"! ! ! Free samples and best
answers are waiting for you.


0.2085 s.