Newest 6 in 1 Hot Air Hair Styler Electric Heatless Hair Dryer Brush Set

Share on (1601184455903):


Price:

Quantity:


Product Overview

Description



Specification


Model number
626-3
Motor type
Brushless machine
Rated power
1400(W)
Temperature regulation
Cold/hot air
Handle folding
non-folding
Nozzle pattern
Single loose air nozzle
Overheat protection
There are
Rated voltage
110 (V)


Product Description




Company Profile


ABOUT COMPANY

Guangzhou Chengnuo Leather Goods Co., Ltd.
Guangzhou Chengnuo Technology Co., Ltd. was founded in 2011, the company set design, research and development, production, sales, service marketing in one, our products include electric shaver, electric straightening comb (curly hair comb), electric foot grinder and so on personal care supplies, to provide customers with a series of personal care products, we have rich experience, with a professional R & D team, Constantly develop new types of products, while having strict quality control, to provide every customer with the best quality star products and services.










Packing & Delivery




FAQ


1. Who are We?
We are a manufacturer and marketer of beauty and personal care products, our company and factory base in Guangdong, China, with 50
~ 100 employees.
2. How do we guarantee quality?
Before mass production, it is always a pre-production sample;
Inspectors will inspect the parts in each process and correct any problems as soon as they are found;
A thorough inspection should be carried out before the final packing of the goods;
Final inspection before shipment.
3. What can you buy from us?
Massage comb, multi-function massage hair straightener, curling iron, wireless curling iron, three-bar curling iron, electric foot
grinder, razor, etc.
4. Why do you buy from us and not from other suppliers?
With extensive experience in the research and development, production and sales of beauty and personal care, brand reputation
protection, we promise you star quality and experience.
5. What about delivery time?
Sample 3-7 days; Batches 7-45 days.
Generally, within 10 to 60 days of receiving the advance payment.


0.1962 s.