Solar lighting kits rechargeable solar home lighting system solar dc system emergency solar lighting system

Share on (1601191463695):


Price:$10.50 - $11.67

Quantity:


Product Overview

Description



Product Description

























































Outdoor portable solar lighting kit with bulb panel solar energy system kits portable solar emergency lighting kits


 Electric currentVoltagepower Lamp beads(pcs) Charge/work time
AC charge:140mA110-240V ----22H
Solar charge:400mA9V0.35W --20H
Frontlight discharge:320mA  2.98V0.95W --18H
Sidelight discharge:420mA 6V2.5W5630*14SMD16H
A bulb discharge:180mA6V0.75W2835*8SMD30H

 


Product Feature:  


1.With a front light and a sidelight.
2.Two charging modes:AC charging and solar energy charging.
3.External bulb with 4 DC output plugs (3 bulbs for product shipment).
4.With USB 5V output.
5.With Charging Indicator Light(It lights on red when charging,and it turns green light when full of electricity).


 


Selling Point:


1.OEM & ODM can be accepted. 
2.Any color is available. 
3.Eco-friendly material. 
4.Use thick outer cartoon,to prevent damage during transport.


 


Our Services: 


1. Sample available;accept trail order. 


2. ODM&OEM are welcome.LCL/OEM/ODM/FCL. 


3. If you want to import some products to test the market,we can lower the MOQ.


4. Welcome to contact us!WD-1101_01WD-1101_02WD-1101_03WD-1101_04WD-1101_05WD-1101_06WD-1101_07WD-1101_08





Recommended Products


809T.jpg802.jpg808t.jpg840.jpg



















Company Information


()_04


 


()_001-1 





Buyer Feedback


-2





Certifications


()_03 





Exhibition


 





FAQ


Q1. Who are we ?


A: Our factory Weidasi established in 2007 which located in Jieyang City, Guangdong Province. It covers an area of 20,000 square meters, has a standard workshop of 52,000 square meters, and 365 sets of equipment, including SMT machines, automatic plug-in machines, CNC processing centers etc


 


Q2. Can I place a sample order to check quality?


 A: Yes,welcome customer check our sample at first.


 


Q3. How about your lead time?


A:Usually need 30-35 days after confirming the order,but not including CNY holiday,It is most important festival in China,exact lead time should be double check.


 


Q4. Why should you buy from us not from other suppliers?
We have more than 700 employees, with a daily output of more than 100.000 pieces and an annual output of 30 million pieces, We are the professional manufacturer engaged in the research,production, sale and service of LED light and Mosquito Swatter.


 


Q5. How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;




0.2207 s.