High Quality Industrial Asphalt Mixer Stationary Asphalt Mixer With Recycle Asphalt Mixer Machine

Share on (1601201632989):


Price:$2,800.00 - $3,500.00

Quantity:


Product Overview

Description



Products Description




Products Description Of High Quality Industrial Asphalt Mixer Stationary Asphalt Mixer With Recycle Asphalt Mixer Machine


Asphalt mixer for road construction, suitable for mixing asphalt at high temperature, can repair potholes on the road, widely used in asphalt pavement common disease treatment, potholes, network cracks, cracks, potholes, flooding oil, small area of pavement paving, etc.; can also be used to pave the asphalt in the yard when needed, and can also be mixed with waste asphalt mixture heating and mixing to save cost.zmwm19






Product Paramenters




Product Paramenters Of High Quality Industrial Asphalt Mixer Stationary Asphalt Mixer With Recycle Asphalt Mixer Machine


Model
ZM-700C
Weight(kg)
1300
Traveling mode
Traction
Generator Set
Corolla
Capacity/kg
One time 700kg
Power(kw)
10kw
Capacity time/min
10-15min
Heating method
Diesel heating
Mixing method
Horizontal drum mixing
Heat transfer method
Burner
Asphalt tank capacity
100L
Burner
Rialto G40
Fuel tank
80L
Appearance size(mm)
3800x1900x1800




Details Images




Details Images Of High Quality Industrial Asphalt Mixer Stationary Asphalt Mixer With Recycle Asphalt Mixer Machine








Company Profile












FAQ




1. You are a manufacturing factory or trading company?
China Coal Group is a manufacturing factory base of mines support equipment, transport equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products.

2. Where is your factory located?
Currently we have one factories in China. One located in Jining, Shandong Province, China . You are warmly welcome to visit us at any time.

3. What are your main products?
We mainly produce mining machinery, road machinery and railway equipment. We can provide you with any machinery you need!

4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large orders, it will take 20-30 days. QTY of the orders will be taken into consideration.

5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.

6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production. Meanwhile our factory owns ISO9001 and is CE and SGS certified.


0.0252 s.