Share on (1601204550641):


Application Temperature | +5°C till +35°C |
Base | Polyurethane |
Closed Cells | ± 70% |
Curing Time | 100 - 120 minutes |
Cutting Time | 60 - 80 minutes |
Density | 20-30 kg/m3 |
Tack free time | 10 - 15 minutes |
Temperature Resistance | -40°C till +90°C |
Thermal conductivity | 30-35 mW/m.K |
Yield | 750 ml = 35 - 40 liter |


Directions for application | ||||||||
Surface preparation | Substrates must be clean and free of dust, oil and grease. It is important to moisten substrates slightly before use as this improves adhesion and finished cell structure of the foam. | |||||||
Recommended application | ||
Remove cap and screw the straw firmly onto the valve. Shake the canister vigorously prior to use at least 20 times. To apply foam, turn the canister upside down and press the adaptor. Half fill the cavity and, in case of low humidity, lightly spray the foam with water. The foam will expand to fill the rest. When fixing window frames, use spacers and wedges to hold the frame in place for approximately 24 hours until the foam is fully cured. Protect eyes and wear gloves and working clothes. Floor-covering and furniture to be covered with paper or plastic foil. Joints wider and deeper than 4 cm should be filled in multiple layers. Waiting time between applications 15-30 minutes. Before each application lightly spray with water. | ||







1.How can you prove that you are a paint manufacturer rather than a trading company?
As the one of The Top 5 paint manufacturer in China.We have many years of experience since 1996 in production and export,welcome to visit our factory at any time.
2.How about the price ?
We can offer the best wholesale price which depend on the quantity of the order.
3.I need to make sure the quality and the color .
Our pleasure!We can offer the liquid Free sample for you to test and color chart.
4.If the product is not ideal, what can we do?
We have perfect after-sales service to help to complete the construction smoothly.
Even if there are any unexpected things in your order, we will assist to solve them.
5.What's your MOQ (min order quantity),production period and delivery time?
Our MOQ is 200Kg. We accept mixed order and the production period and delivery time are 7-10 days.
6.I want to put my Logo on the packing .
We can accept the OEM, waiting for your details requirement.
HOW TO CONTACT US ?
Mr. Martin Liao
WhatsAPP +8613925957396
Mob +8613925957396
QQ 312299026
WeChat 312299026
E-mail martin@maydos.cn
martinliao2020@hotmail.com
New products from manufacturers at wholesale prices