OEM Aluminum Stainless Steek Ductile Iron Die Casting Parts 304 316 2205 Pump Housing Casting Parts

Share on (1601208921998):


Price:$10.00 - $15.00

Quantity:


Product Overview

Description



OEM Aluminum Stainless Steek Ductile Iron Die Casting Parts 304 316 2205 Pump Housing Casting Parts



SHANDONG FANGZHUO FABRICATION CO.,LTD.
山东方卓精工机械有限公司










Product Name
Casting Metal Part
Surface Treatment
Anodizing/Painting/Powder Coating/Sand Blasting/Electroplating, etc
Material
Iron/Stainless Steel/Aluminum/Copper/Titanium Alloy
Equipment
CNC Lathes/CNC Milling Machine/CNC Machining Center etc
Casting Equipment
Die Casting Machine/
Testing Equipment
Ultrasonic Flaw Detector/Vernier Calipers/Coordinate Measuring Machine
Lead Time
20~30 days
Machining Tolerance
bigger than 5 micron 
Payment Term
The sample fee must be paid in full, and the mold fee must be paid in full
Casting Method
Die Casting/Lost Foam Casting/Coated Sand Casting/Lost Wax Casting
/Wax lost foam casting/Gravity Casting
Drawing Format
STP/IGS/X-T/STL/PDF


Product Overview


Shandong Fangzhuo Fabrication Co.,Ltd, was established in December 2018 with more than 100 employees, located in the Economic De-velopment Zone of Qihe County, Dezhou City, Shandong Province. We have anannual output of 7 thousand tons of processing capacity, mainly engaged inconstruction machinery, engineering equipment, CNC/laser machine tools andother important equipment mechanical parts forming and automation integra-tion.


Our products mainly include engineering machinery accessories, engineer-ing equipment accessories, all kinds of machine tool accessories processing and manufacturing. With the help of computer technology, we have formed a sef of management systems from product drawings toproduction quality tracking, from financial
control to material consumption, fromproduct market development to sales and after-sales service, and a set of hori-zontal to edge
and vertical to the end.








FAQ


Q1:What materials can you process?
A1:Aluminum,Ductile Iron,Brass,Stainless Steel,Titanium Alloy

Q2:How long is your delivery time?
A2:Usually 25~35 work days

Q3:What kind of after-sales service do we have?
Answer:Our factory technicians can remotely provide technical support such as processing technology and processes, identify product risk points in advance, and give reasonable suggestions.


Q4:What surface treatment can you provide at present?
A4:Anodizing, electroplating, painting, sandblasting etc.,

Q5:Can you provide test reports and material certificates when shipping?
A5:Corresponding proof can be provided upon request.

Q6:What kind of test tools do you have?
A6:All processed parts in our factory will be issued with inspection reports before leaving the factory. Our inspection
equipment includes: vernier calipers, Coordinate measuring machines, Quadratic element measure,Spectrometers, Concentricity meters, and Altimeters etc.


0.1018 s.