IGUICOO Energy Recovery Ventilation HRV Air Recoperator Heat Exchanger System Steel for Gym Hall Basement School Dining OEM/ODM

Share on (1601227767140):


Price:$364.00 - $445.00

Quantity:


Product Overview

Description



IGUICOO Heat Recovery Air Ventilation System Air Recuperator Fresh Air Ventilation System


Warranty
1 Year
After-sale Service
Online technical support, Free spare parts
Project Solution Capability
Provide overall solution
Application
Hotel/School/Commercial building/Real estate project etc
Design Style
Modern
Place of Origin
China
Model Number
TFKC-045(A1-1A2)
Air Flow(m³/h)
450
Heat Recovery Type
Enthalpy exchanger
Efficiency(%)
75%-80%
Power Voltage(V)/Frequency(HZ)
220-240/50-60HZ
OEM/ODM
Accept


Product Description



Feature:

1、Fresh air +Energy recovery
2、Airflow: 150-450 m3/h
3、Counterflow enthalpy exchange
4、Filter: Primary filter+H12(can be customized)
5、Buckle type bottom maintenance easy replace filters
6
Ideal ventilation solution for residential and light commercial project.






  High eficiency Energy/heat recovery ventilation technology

In the hot season, the system precools and dehumidifies the fresh air, humidify and preheat in the cold season. 


High efficiency enthalpy heat recovery
More energy efficient, more comfortable indoor climate. Effective air exchange rate above 98% ,Using polymer membrane material, with high total heat recovery efficiency, with long-term antibacterial and mildew prevention
function, washable, life span up to 3~10 years.


AC motor
AC motor, stable performance, high speed, high voltage, high current.Three speed speed, high cost performance.

Purification system




G4*2+H12(Customizable)

A: Primary purification(G4):
The primary filter is suitable for the primary filtration of ventilation system, mainly used for filtering dust particles above.5μm; (Default white G4 primary filter, if you need paper carbon filter as right above picture, please contact customer service)

B: High efficiency purification(H12):
Effectively purify PM2.5 Particulate, for 0.1 micron and 0.3micron particles, the purification efficiency reaches 99.998%. It traps 99.9% of bacteria and viruses and causes them to die from dehydration within 72 hours.


Controller




Black screen with remote control ERV function.
Green screen as the basic model, no remote control function, can only switch wind speed.
The price of the link is for the basic model(green controller).
We also have a wider selection of DC motor models,if you need,pls feel free to contact us

Feature (Intelligent controller + Tuya App
1、2.8-inch code screen, PM2.5, CO2(optional), temperature, humidity and other data display, indoor air quality real-time control.(The basic model does not include any sensors)
2、temperature and humidity sensor IC, etc., can accurately detect
3、Time programming, can control the time period of the machine, to achieve energy saving personalized program customization requirements.
4、APP remote control, real-time monitoring data, more convenient control.
5、Multi-languages optional








Dimensions




Model
Rated Airflow
(m³/h)
 Rated E.S.P(Pa)
 Temp.Eff.
(%)
 Noise
(dB(A))
 Power input (W)
 Connect Size
Size(mm)
N.W(Kg)
 TFKC-015(A1-1A2)
150
80
75-80
32
75
110
690*660*220
28
 TFKC-020(A1-1A2)
200
30
75-81
36
90
110
690*660*220
28
 TFKC-030(A1-1A2)
300
30
74-82
38
120
150
735*735*265
35
 TFKC-045(A1-1A2)
450
30
74-82
39
150
150
735*735*265
35




Model Selection Guide and Installation


We can provide free pipe layout design according to your house type
Reference value standard


Selection of air flow:

First of all, the selection of air volume is related to the use of the site, population density, building structure, etc
Explain with domestic residence only now for example:
Calculation method 1 :
Refer to the Design Code for Heating, Ventilation and Air Conditioning of Civil Buildings (GB 50736-2012) to calculate the fresh air volume.The specification provides the minimum amount of fresh air duct (that is, the "minimum" requirement that must be met).According to the right table, the number of air change cannot be less than 0.5 times /h. The effective ventilation area of the house is 85㎡,the height is 3M. The minimum fresh air volume is 85×2.85 (net height) ×0.5=121m³/h, When selecting equipment,the leakage volume of the equipment and air duct should also be added, and 5%-10% should be added to the air supply and exhaust system.Therefore, the air volume of the equipment should not be less than: 121× (1+10%) =133m³/h. Theoretically, 150m³/h should be selected to meet the minimum requirements.

Calculation method 2 :
For residential recommended equipment selection reference to more than 0.7 times of air change; Then the air volume of the equipment is: 85 x 2.85 (net height) x 0.7 x 1.1 =186.5m³/h,According to the existing equipment model, the house should choose 200m³/h fresh air equipment! Pipes must be adjusted according to air volume.



Energy recovery ventilation (ERV) is the energy recovery process in residential and commercial HVAC systems that exchanges the energy contained in normally exhausted air of a building or conditioned space, using it to treat (precondition) the incoming outdoor ventilation air. During cooler seasons the system humidifies and pre-heats. An ERV system helps HVAC design meet ventilation and energy standards (e.g., ASHRAE), improves indoor air quality and reduces total HVAC equipment capacity, thereby reducing energy consumption and enable an HVAC system to maintain a 40-50% indoor relative humidity, essentially in all conditions.
Importance
To use proper ventilation; recovery is a cost-efficient, sustainable and quick way to reduce global energy consumption and give better indoor air quality (IAQ) and protect buildings, and environment.


Application


ERV installation
The device can be ceiling-mounted or wall-mounted,ceiling supply fresh air.
If floor air supply is required, pls choose the TFKC-A2 series (DC motor) with higher static pressure


Installation location selection
You can choose areas such as kitchens、bathroom、 utility room、laundry room that do not have a high demand for the height of floor.The location depends on the customer's room design plan.


222



About us
1.Have 2 plants meet the capacity demands 2.Possess 80 patents certificates
3. 11+ years experience HVAC industry 4. Have strong R&D and HVAC design team
5. Free installation plan design service 6.A full set of ventilation system installation pipe fitting supply
7.Have 2 laboratories(national approved enthanlpy and 30 laboratory
8. Duilt a sound certificate system of ISO9001, ISO 14001, ISO45001, CE certificate and other product certification system.




Application


ERV installation
The device can be ceiling-mounted or wall-mounted,ceiling supply fresh air.
If floor air supply is required, pls choose the TFKC-A2 series (DC motor) with higher static pressure


Installation location selection
You can choose areas such as kitchens、bathroom、 utility room、laundry room that do not have a high demand for the height of floor.The location depends on the customer's room design plan.


Packing & Shipping


Wooden pallet + carton packing
Conventional packing for abroad
Wooden case + carton packing
If you need this, please communicate in advance
Foam + carton packing
Standard packing


FAQ
Q1: How could I get a sample?
A:Please feel free to contact our customer service, she can tell you the details of the sample.
Q2: Sample time?
A: Within 2~35 days;
Q3: Whether you could make our brand on your products?
A: Yes. We can print your Logo on both the products and the packages if you can meet our MOQ.
Q4: Whether you could make your products by our color?
A: Yes, The color of products can be customized if you can meet our MOQ.
Q5: How to guarantee the quality of your products?
A: 1) Strict detection during production.
2) For device host,100% test before leaving the factory,for piping fittings,strict sampling inspection on products before shipment and intact product packaging ensured.







0.4839 s.