Share on (1601229333367):

6061 aluminum is, by any measure, the most commonly used aluminum alloy in the world. 6061 I-beams are structural components useful in almost any project due to their strength,heat treatability, comparatively easy machining, and weldability.
Grade | Aluminum Alloy 6061 |
Temper | T3-T8 etc |
Application | Construction Formwork and Scaffolding |
Shape | Square, V, T, C, U, oval, other customized shape |
Alloy or Not | Is Alloy |
Model Number | I Beam, H Beam |
Brand Name | CIEZN |
Tolerance | ±1% |
Processing Service | Bending, Welding, Punching, Cutting |
Element | Si | Fe | Cu | Mn | Mg | Cr | Zn | Ti | Al |
Result(%) | 0.62 | 0.28 | 0.21 | 0.08 | 0.82 | 0.06 | 0.05 | 0.02 | 97.86 |
| Items | Tensile Strength | Yield Strength | Elongation | Webster Hardness |
| Result | 310MPa | 270MPa | 0.1 | 14-15 |


As primary and secondary girder of the shear wall, slab and column formwork.


The CIEZN technical team could help our customer's construction team to install the first 2-3 floor of their project.

CIEZN Group was founded in 1998, with two industrial parks, one is located in Yueyang,Hunan , and the other is located in Yiyang,Hunan. For more than two decades, it has been following the development concept of green innovation, focusing on the R&D, application innovation, advanced manufacturing and installation of prefabricated building aluminum formwork, CIEZN has grown into a well-known high-tech enterprise in China.
After 27 years development, CIEZN has got each of the certifications requested in the productions. Like: ISO9001-2015 certification, ISO45001:2018 certification, etc.



Yes, there are nearly 70% standard panels can be common reused.
-Q-:What's your packing methods?
Wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
T/T 30% in advance & T/T 70% before shiping to port, L/ C 100%, or negotiate according to the order status
-Q-:Are you manufacturer or trader?
A: CIEZN is the manufacturer of aluminum formwork system for more than 10 years.
-Q-: How to proceed an order for aluminum formwork?
1- Please provide completed project drawings to us.
2- CIEZN design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.
3- Construction details confirmed, sign sales contract, receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance and check.
8- Shipping.
New products from manufacturers at wholesale prices