Commercial Hotel Restaurant Stainless Steel Kitchen Catering Equipment Gas grill griddle (OT GT 36)

Share on (1601237154222):


Price:$370.00 - $375.00

Quantity:


Product Overview

Description



Company Introduction




Product Description


Features
1.Stainless steel body for Stainless Steel Counter Top Gas Griddle/Gas Hot plates/Kitchen Frytop .
2.Iron plate, 12mm thickness.
3.Precise thermostatic control between 50-300℃ for oven.
4.Oil-catching basin.
5.Easy to clean and maintain.













Specification


Model
OT-GT-24
OT-GT-36
OT-GT-48
Size(mm)
610*770*420
915*770*420
1220*770*420
HP
17.6kW (60720BTU)
26.4kW (91080BTU)
35.2kW (121440BTU)
Net Weight
91Kg
129Kg
169Kg
Burner
2
3
4
Flat/Grrooved
Flat
Flat
Flat 


Similar Production


OT-GA-718
OT-GA-721


OT-GA-722
OT-722


Certifications






Packing & Delivery






1.If your order 1pcs as the sample. we will choose delivery by DHL, FEDEX or UPS.

2. If your order more than 5 CBM, we will delivery by ship.

3. If your order enough for a container: we can offer FOB price to make your more convenience.

4. If you have warehouse or agent in Guangzhou, we can delivery to the warehouse for free.

5. If you do not have warehouse in Guangzhou, we can delivery by CIF price.


FAQ


1. Q: What Is Your Minimum Order Quantity(MOQ)?
A: 1 Set.We are a manufacturer and generally do wholesales. However, trial orders and small orders are also acceptable and
welcome!

2. Q: How Can I Pay For My Order?
A: 1. Telegraphic Transfer(T/T): We accept 30% T/T deposit before production and 70% T/T balance before shipment.100% payment
before production for sample orders.
2. Alibaba trade assurance.Other payment methods can be discussed.

3. Q: What Are The Shipping Costs?
A: 1. Shipping cost is based on number of packages, gross weight of those packages, total package volume and destination port.
2. We will package your goods in the strong export standard cases, your order will be shipped via the most economical carrier,
unless you specify otherwise.

4. Q: How About The Delivery Time?
A: 1. Some of the products are in stock at our warehouse is European plug, generally we need 1~3 days to change the plugs and pack
them before the delivery.
2. Regarding to the non-stock products, the lead time is 15-45 days depends on your requirements and order quantity.
3. We will suggest you the fastest shipping methods when you need the products urgently.

5. Q: Can you help us to make our products?
A: Yes,sure we can,our company OEM is warmly welcome! Our company have been in making kitchen equipment since 2006, we are
professional kitchen equipment factory in Guangzhou.




0.199 s.