50 TPH gold trommel for sale

Share on (1601237412453):


Price:$27,700.00 - $29,800.00

Quantity:


Product Overview

Description









DMT-50 Portable Gold Trommel Wash Plant
Make
Downunder4gold
Model
DMT-50
Name
Gold Trommel Wash Plant
Capacity
22-33 YPH (30-50 TPH)
Supply Voltage
Diesel engine, generator optional
Water Connection
4 inch Water Feed with Camlock Fitting
6inch Water Manifold with Additional Outlets
Requires 4 inch Water Pump (100-120m³/h,1800-2200 GPM)
Vibrating feed hopper
With water spray bars,
Adjustable hopper angle with hydraulic lifting
Adjustable water pressure
Grizzly hole size 60-80mm
Sluice box
1200*4200mm (Length, Width)
Expand mesh, Rubber mat, Miner moss, Other mats optional
Screen drum
High manganese mesh, 8~20mm optional ,Default size 12mm
Diameter 1000mm, scrubber 1700mm long, screening 1500mm long. inside wear lining metal, clay break bar
2 inch water spray bar inside drum
Transmission
Chain drive, 
Power: 192 FS diesel engine, 13HP/8.5kw (motor optional)
Mobile
16 inch off-road wheel
with trailer towing bar
4 pcs 5000 pounds jack leg, leveling easy
Wheels and jack legs are  dis-assemblely
Accessories
4 inch diesel water pump
200 meter 4 inch Lay-flat hose with camlock
6 meter suction hose
Dimension
5600*2000*3500 mm (L*W*H)
Weight
5.5 ton
Quantity load
one 40HQ is prefer, will have 20-30 m3 free space






























Q: Are you a factory ?
Reply: Yes, we are factory, 3200 square meter workshop and office.

Q: What is gold recovery rate of your equipment ?
Reply: All gravity recovery methods are highly dependent on particle size and shape.
Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate.
anyone say that equipment recovery is 80%, 90% something is not true. it’s all depends. but 90% of placer mining gold wash plant will use sluice boxes rather than jig, concentrator, etc.

Q: Gold trommel vs Gold shaker deck ?
Reply: While the capital equipment cost for trommel and shaker decks of equal diameter/width is
similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.

Q: What is difference of Downunder4gold equipment ?
Reply: we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.

Q: What is delivery time ?
Reply: Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.

Q: Are you supply accessories used on gold wash plant ?
Reply: Yes, we supply all accessories and tools, such as water pump, layflat hose, diesel generator, even we can out sourcing trucks, Wheel loader, Bulldozer, Excavator.
we will put orders together in our factory, and we can book the shipment for our client.


Q: Do you supply installation service ?
Reply: Yes, Downunder4gold will give the installation guide to our client. most of our wash plant model are modular, easy and fast installation. remote installation will help in most case.





0.0796 s.