Share on (1601237657375):
Mini Tabletop Vibration Table Chocolate Melting Tempering Machine Small For Sale |
Introduction of the chocolate melting tempering mould filling machine |
1. This Chocolate Forming Machine is made up the pouring, vibrating and Auto temperature control into one. |
2. It is quite flexible, and to be with compact conformation. |
3. It is easy operation and convenient maintenance. |
4. It is the main equipment which suitable for pouring and filling chocolate on-the-spot in food company, lab and shops |

Introduction of the chocolate melting tempering mould filling machine | ||||||||||
Model | Capacity | Voltage | Power | Size | Weight | |||||
GM-08 | 8kg/batch | 220/110V | 650W | 435*510*480mm | 38KG | |||||
GM-15 | 15kg/batch | 220/110V | 850W | 560*600*590mm | 52KG | |||||
GM-30 | 30kg/batch | 220/380V | 1500W | 900*670*1230mm | 120KG | |||||
GM-60 | 60kg/batch | 220/380V | 2000W | 1130*750*1300mm | 140KG | |||||
Pictures of the chocolate melting tempering mould filling machine | Specification of the | |







We have many other goods to meet your requirement, if you don't satisfied this one, please check those type and click the pictures to get more details. or you can contact with us to talk about the details. | Specification of the | |
Packaging and Delivery | Specification of the | |

Certification of our company. | Specification of the | |
We are Zhengzhou Gemini Machinery & Equipment Co., Ltd. We export the food machines for many years. Our company provides high quality products and the best services. We have won a high reputation among clients. We always keep good relationships with our customers. | ||

Q: Are you factory? |
A: Yes, sure. we are original factory. |
Q: Do you have MOQ? |
A: Our MOQ is one set . |
Q: How can i contact with you about the product details? |
A: You can chat on Alibaba.And you can call me directly. |
Q: Do you have a warranty? How long? |
A: we offer 1 year warranty for all of parts. |
Q: Do you have any certificate to compliance with our country? |
A: Our production passed CE, we do can apply for Form A, CO, and others as customers requirement. |
Q: What is the delivery time of the machine? |
A: Usually the single machine can be sent within 7-15 working days after getting the deposit. |

New products from manufacturers at wholesale prices