Factory Hot Selling Small Thermal Insulation Polystyrene Granule Mortar Spraying Machine With CE

Share on (1601240956865):


Price:$600.00 - $700.00

Quantity:


Product Overview

Description



Products Description




Product Description Of Factory Hot Selling Small Thermal Insulation Polystyrene Granule Mortar Spraying Machine With CE




GLP-311 Mortar Plastering Machine is widely used for spraying mortar on the wall ,tunnel ,channel,etc.
Available spraying material means sand ,cement , water,etc , other things that the diameter is no more than 5mm.zmwm23




Product Paramenters




Product Parameters Of Factory Hot Selling Small Thermal Insulation Polystyrene Granule Mortar Spraying Machine With CE


Modle
311
511
711
911
Power
4.0KW
7.5KW
11KW
7.5+2.3KW
Voltage
220V/380V customizable
7.5KW
11KW
7.5+2.3KW
Conveying distance
15M
20M
65M
60M
Conveying height
10M
15M
35M
30M
Air compressor
3.0/2.2KW
5m³/H
4m³/H
3m³/H
Through the particles
<4MM
3-4MM
10MM
≤10MM
Weight
160KG
320KG
220KG
Size
1750*450*800
1300*600*800
1850*650*950




Details Images




Product Rael Shot Of Factory Hot Selling Small Thermal Insulation Polystyrene Granule Mortar Spraying Machine With CE








Our Advantages












FAQ




1. You are a manufacturing factory or trading company?
China Coal Group is a manufacturing factory base of mines support equipment, transport equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products.
2. Where is your factory located?
Currently we have one factories in China. One located in Jining, Shandong Province, China . You are warmly welcome to visit us at any time.
3. What are your main products?
We mainly produce mining machinery,road machinery and railway equipment. We can provide you with any machinery you need!
4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large orders, it will take 20-30 days. QTY of the orders will be taken into consideration.
5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.
6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production.


0.1915 s.