Petrol Station Underground PE Pipeline Fuel Dispenser Fitting Coupling 90 Degree Double Layer 75 63 Capacitor Connector

Share on (1601243878597):


Price:$16.00 - $75.00

Quantity:


Product Overview

Description



Product Overview


Terminal Detection Connector
Feature performance description:
1. High elongation at break, good extensibility, and excellent scratch resistance.
2 Non-toxic, good toughness and high impact strength.
3. Good insulation performance, excellent wear resistance and chemical corrosion resistance.
4. Good thermal insulation and small medium flow resistance.
5. Convenient and economical to lay, safe and reliable to use



FEATURES AT A GLANCE


Advantages of Electrofusion pipe fittings:
1. The electrofusion process is fully automated, simple and safe to operate.
2. Good hygienic performance.
3. The high strength of electrofusion welding essentially guarantees the identity of the interface material and structure of the PE pipeline system and the pipe itself, achieving a high degree of integration of pipe fittings and pipes, ensuring no leakage at the interface, reliable connection without hidden dangers, and very durable,grind.




Things to note when constructing PE pipe fittings:

PE pipe fittings are an indispensable part of PE
pipeline construction, and the connection between pipelines and PE pipe fittings is particularly important.
1. When connecting in cold climates (below -5 degrees) and windy environments, maintenance measures should be taken or the connection process should be adjusted.
2. Corresponding special heating machines should be used according to different interface methods, and open flames are not allowed to be used to heat pipes and PE pipe fittings!
3. Pipes connected by fusion should use pipes and fittings of the same brand and matching performance. Pipes and fittings with similar performance must be tested and qualified before construction can be stopped.
4. Before connecting PE pipes and pipe fittings, PE pipes, PE pipe fittings and facilities and equipment should be inspected according to design requirements, and inspected before the construction site. As long as the pipes and fittings meet the requirements, construction and use will begin. The main inspection items include product pressure level, surface quality, matching product quality, etc.


PRODUCT CONFIGURATION




SALES AND SERVICE NETWORK




Successful Project




SIMILAR PRODUCTS




FAQ


Q1: Are you a factory?
A: Yes, we are a manufacturer since 1985. We have rich production experience and strict quality control.

Q2: Does your company or your product have any certifications?
A: Yes, we have ISO, CE certifications, and also hold patents.

Q3: What is your sample policy?
A: Normally, the customer should pay for the shipping charges and we provide free samples based on a small quantity.

Q4: What is your MOQ (Minimum Order Quantity)?
A: The MOQ varies by product and can be discussed.

Q5: What are the terms of payment?
A: T/T (Telegraphic Transfer) before shipment.

Q6: How about your delivery time?
A: We can dispatch within 3 days if the product is in stock. Normally, it takes 20-35 days for bulk orders.

Q7: What is your packing?
A: Standard export packing.

Q8: How do you ensure long-term business and good relationships with your customers?
A: We maintain good quality and competitive pricing to ensure our customers' benefits. We also prioritize our customers' concerns, providing quick responses and resolving any quality issues promptly.


0.1409 s.