Share on (1601249054297):

High quality electric vibrating table for concrete paver are utilized for compacting materials as well as for loosening bulk material by vibration. Applications of High quality electric vibrating table for concrete paver are typically used in are compacting, such as eliminating the air from the mould / paving/ bricks, compaction of packing, concrete mixes or knock out of molds. Vibrating table is mainly composed of: bracket, table, vibration motor, shock absorption institutions.
There are two-dimension and three-dimension vibrating table for High quality electric vibrating table for concrete paver.
Two-dimension vibrating table

Three-dimension vibrating table
Application site
There are many models for High quality electric vibrating table for concrete paver, and the area ranges from 0.25 to 9m2. The following table shows the detailed data for your reference.
| Model | Area(m2) | Power(kw) | Amplitude(mm) |
| ZP-500*500 | 0.25 | 2*0.25 | 2-5 |
| ZP-1000*1000 | 1 | 2*0.4 | 2-5 |
| ZP-1200*1200 | 1.44 | 2*3 | 2-5 |
| ZP-1500*1500 | 2.55 | 2*3 | 2-5 |
| ZP-2000*2000 | 4 | 4*3 | 2-5 |
| ZP-3000*3000 | 9 | 6*1.5 | 2-5 |
High quality electric vibrating table for concrete paver is made up of table-board, vibration motor, damping spring and foundation bed.
High quality electric vibrating table for concrete paver has following features:
1. Vibrating motor is the vibration source, low noise, low energy and simple maintenance.
2. Simple structure, stable working, light weight, small volume, easy installation.
3. Max table size: 8meters ×4meters, max loads: 20tons
High quality electric vibrating table for concrete paver is packed by wooden case or according to the customer's requested.
Certificate
We have international qualified certificates for High quality electric vibrating table for concrete paver.
Company Information
Q: What information do I need to provide for getting an accurate quotation for High quality electric vibrating table for concrete paver?
A: 1. max loading___tons
2. table size
Q: How long for the delivery time?
A: 5-10 working days for conventional products.
Q: How long for warranty time?
A: 12 months from the shipping date.
New products from manufacturers at wholesale prices