Q1: What is the payment process for the steel swim pool?A1: First, client confirms the order and arrange the 50% deposit to us. When we got the deposit, we will arrange the installation drawing, after confirmed the drawing then we will arrange to produce. After finished the production, we will inform the client then send them the pictures and videos of the steel pool, and after we got the full 100% payment from client, then we will arrange the shipment until the goods arrived at the site of clients.
Q2: What is the smaller size that you can offer?
A2: We suggest the smaller size at least with 5m long by 3m wide.
Q3: Could you offer the installation drawing for the steel pool?
A3: Yes, after 50% deposit, we will free offer you the installation drawing and video of the steel pool.
Q4: What is the lead time for steel swim pool?
A4: Normally the lead time for steel swim pool is 10-20 working days.