Underground UPP pipe Gas Station Plastic Pipe Hdpe Fuel Double Wall PE Pipe

Share on (1601252522146):


Price:$0.31 - $0.33

Quantity:


Product Overview

Description



Product Description


PE100 High Density Polyethylene HDPE petrol station pipeline(non-conductive static) coils

CHUANGRONG petrol station pipeline system advantages:
1. Double protection,Zero penetration:CR petro pipeline system eliminates the possibility of fuel Spills into environment, thus protecting the soil and water from pollution effectively.
2.Safe and efficient installation, Low cost:CR petro pipeline welding uses intelligent welding machine which lets double pipe connected completely.CR petro pipeline system is without concrete trench and installation costs is greatly reduced.
3.24 hours monitoring:CR petro pipeline system has a leak detector, the pipeline for 24 hour monitoring.Once leaked, Indoor monitoring system will alarm.
4.Collision,Puncture,Tensile,Anti-ground motion capability.



Basic Information


Specification of HDPE petrol station pipeline


Product Code
Description
CR-54EC6
OD54mm single layer pipe, 50m/Roll
CR-63EC6
OD63mm single layer pipe, 50m/Roll
CR-65/54EC6
Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
CR-75/63EC6
Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length




Product Code
Description
CR-54EC6
OD54mm single layer pipe,5.8m/Length
CR-63EC6
OD63mm single layer pipe,5.8m/Length
CR-90EC6
OD90mm single layer pipe,5.8m/Length
CR-110EC6
OD110mm single layer pipe,5.8m/Length
CR-65/54EC6
Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
CR-75/63EC6
Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length
CR-125/110EC6
Outer pipe with OD125mm,Inner pipe with OD110mm double layer pipe, 5.8m length


Certificate:ISO, CE,BV,SGS
Packing Method:Normal export packing.
Pipe dia.54mm-75/63mm can be in coils with 50m length;
Pipe dia. 54~125/110mm in bars with 5.8m length.
Production Lead Time:Depending on the order quantity.
Normally about 2 weeks days for 20ft container, 3·4 weeks for a 40ft container.
Supply Ability:100000 Ton/Year
Payment Method:T/T, L/C at sight,West Union
Trading Method:EXW, FOB, CFR, CIF,DDU


Applications




FAQ


Q: Are you trading company or manufacturer ?
A: We have our own pipe and fitting factory, and we also sell the plastic welding machine.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. If it is not available will be according to the quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: L/C,PAYPAL,Western Union,MoneyGram,T/T and so on.
Q: Can I visit your factory?
A:Sure, our factory in Chengdu, China. If you want to have a visit to our factory, please contact us to make an appointment.
Q:What about the after-service
A :Cantact us first, then we will arrange the after-sale service .
Q: Can you make my designs? OEM or ODM models?
A: Yes, we can make your designs. OEM and ODM models are always welcomed too.
Q: Where is your loading port?
A: Ningbo,Shanghai,Dalian.
Q: What if I can't find the infos I'm looking for, or what if I want to speak to someone directly?
A: 1)Start online TM or inquiry now, feedback will be got promptly or latest within 24 hours.
2) Call customer service at +86-28-84319855 for customer service support.




0.7454 s.