Q1. Are you a factory or trade company? We are a factory located in No. 15 Longgang Road,Nanling Village, BaiyunDistrict,Guangzhou
Q2. What kind of production service do you provide? Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time? Mold: 3-5 weeks Mass production: 3-4 weeks
Q4. How about your quality? ♦We have got ISO9001:2015 and IATF16949 certificates. ♦We will make the operation instruction once the sample is approved. ♦We will 100% inspect the products before shipment. ♦Transactions can be through Alibaba's trade assurance.
Q5. How long should we take for a quotation? After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element? Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term? Mold: 50% prepaid, balance after sample approval. Goods: 50% prepaid, balance T/T before shipment.