Factory low price Dx51d Dx52d Dx90d galvanized steel coil dc01

Share on (1601272524855):


Price:$540.00 - $600.00

Quantity:


Product Overview

Description





Thickness
0.13-3.0mm
Width
500mm-1500mm
Length
As customer's request
Zn coating
0.13-0.8 mm is 30-150 g/m2; 0.8-1.5 mm is 30-180 g/m2;1.5-6.0 mm is 30-275 g/m2
Coil ID
600-1500 mm,Normal width is 91 4/1000/1219/1250/1500 mm
Steel grade
DX51D,DX52D,DC01,DC02,SGHC
Surface
regular/mini/big/zero spangle,skin pass, chromated, unoiled, dry
Packaging
seaworthy export standard package, or according to the customers’requirement
Delivery time
With 7 –15 days after receipt of deposit or L/C
Productivity
2000 ton /month
Warehose Stcok
Normal Grade 10000 tons per month
















JIANGSU HONGGANGMILAI METAL CO.,LTD has been active in the domestic
steel market since 2002, serving key industries as a designated supplier.
Expanding globally in 2013, the company now provides one-stop solutions for
steel and metal materials to customers in over 110 countries, including Europe,
the Middle East, South America, and Southeast Asia.
Based in Wuxi, the company has invested in diverse production lines and mai-
ntains strong partnerships with leading steel mills like Baosteel, TISCO, and
POSCO. It operates its own warehouses at major Chinese ports to ensure timely
deliveries.Guided by the principles of quality, high-end standards, green practices,
and ecological sustainability, HONGGANGMILAI strives to be a lasting benchmark
in the industry, contributing to the advancement of the steel sector.
















Q:Can you send samples?
A:Of course, we can send samples to all parts of the world, our samples are free,
but customers need to bear the courier costs.
Q:What product information do I need to provide?
A:You need to provide the grade, width, thickness and the number of tons you
need to purchase.
Q:What are the shipping ports?
A:You can choose other ports according to your needs.
Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials.
Q:How long does your delivery time take?
A:In general, our delivery time is within 7-45 days, and may be delayed if the demand is
extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging.


0.1488 s.