Idle Air Control Valve suitable for HYUNDAI ACCENT 1995 1999 0K01120660 3515022000 0280140505 7586026 60562537 0K011 20660

Share on (1601274276074):


Price:$20.00 - $25.00

Quantity:


Product Overview

Description



Product Description


1 (1).jpg






































 Our Advantages

 1. High Quality & Best Price


 2. Customized any Products You Need
 3. Professional Development Team with International Leading Core Technology
 4. Strict Testing Process & Quality Assurance
 5. 24-Hour Online Service
 Our Promise

 A. Offer the Most Competitive Price to Our Customers 


 B. Ensure the Excellent Quality of Products
 C. Deliver the Product on Time with Great Package
 D. Realize Win-Win Result and Long time Cooperation 

SCYIACV-069 (1).jpgSCYIACV-069 (2).jpgSCYIACV-069 (3).jpgSCYIACV-069 (4).jpg





HOT PRODUCTS


 


1 (2).jpg



































Our Services


 


1 (3).jpg













Company Information


1 (4).jpg 





Packaging & Shipping


1 (5).jpg 





FAQ


1 (6).jpg


Q: Are you a factory or trading company?
      • We are a professional trading company and cooperating with hundreds of suppliers. So we have our extensive supply chain resources.

Q: What kind of products do you supply?
      • 1) Engine System: Fuel Pump Assembly, Carburetor, Intake Manifold, Timing Chain Kit...
      • 2) Electrical System: Door Lock Actuator, Mass Air Flow Sensor, EGR Sensor, Power Window Motor, Fuel Pump Drive Module...
      • 3) Cooling System: Coolant Recovery Tank, Oil Cooler, Radiator, Water Pump, EGR Cooler...
      • 4) Steering System: Power Steering Gear, Power Steering Hose, Power Steering Pump...

Q: What is the MOQ for each item? 
      • Usually the MOQ is 20 pcs. There is no limitation for MOQ if this product we have in stock.



Q: Do you give any guarantees for JINYI products? 
      • Yes ,we have one year guarantee for our products. 



Q: How to control the quality of JINYI products? 
      • Each product is tested before delivery.
      • With advanced equipments, skilled workers and strict production process.
      • Our QC team will check the products before each shipment.



Q: How long for you to deliver the product after the deposit? 
      • Sea shipment: Generally will take 25-30 days to prepare the whole order.
      • Sample&Express Delivery: Usually will take 7-15 days to prepare.
      (If we have this product in stock, we can deliver the goods within 3 days.)




0.1559 s.