China 30 132kv steel power transmission line tower multi circuit transmission line tower

Share on (1601278027607):


Price:$900.00 - $1,200.00

Quantity:


Product Overview

Description



Company Profile








Transmission line tower
Transmission line tower is a tower-like structure used for power transmission. Their structural characteristics are that all kinds
of tower types are space truss structure, the rod is mainly composed of a single equilateral Angle steel or combination Angle
steel, the material is generally used Q235 (A3F) and Q345 (16Mn) two kinds, the connection between the rod is made of coarse
bolts, by the bolt shear connection, the whole tower is composed of Angle steel, connecting steel plates and bolts. Individual
parts, such as the tower foot, are welded into a composite by several steel plates, so it is very convenient for hot-dip
galvanizing anticorrosion, transportation and construction. For the tower with a height below 60m, foot nails are set on one of
the main materials of the tower to facilitate the construction personnel to climb the tower.


Product name
Transmission line tower
Surface
Hot Dipped Galvanzied
Certificate
Certificate
Advantages
Customized Service Provided
Customized Service Provided
Customized Service Provided
Engineering Service
Engineering
Our Service
Professional Customization Services


Drum Type
Drum Type
It is a double circuit towercommonly used towertype, the conductor isdrum-shaped arrangementand thus the name.
'干' Type
'Mainly used as tension-resistant tower and corner tower, it is the commonly used tower type for 220 KV and above voltage level power transmission lines.


Wine cup Type
Usually used for 110 kV and above voltage level power transmission lines especially suitable for heavy ice area or multi-thunder area.
Cat's Head Type
It is a common tower type for power trans-mission lines of 110 kV and above voltage level.Its advantage is that itcan effectively save the line corridor.




galvanizing
After assembly & test, the next step will be carried out: hot dip galvanizing, which aims at beauty,prevention and prolonging the service life of the steel tower.The company has own galvanizing plant, professional galvanizing team, experienced galvanizingteachers for guidance, and processing in strict accordance with IS01461 galvanizing standard.The following are our galvanizing parameters for reference:


galvanized standard
ISO1461
Raw Material Standards
GB/T700-2006, ISO630-1995, GB/T1591-2018;GB/T706-2016;
Fastener Standard
GB/T5782-2000. ISO4014-1999
EU Standard
CE : EN10025
American Standard
ASTM A6-2014


Power tower test assembly
Power tower test assembly


Product Paramenters










Features:
1. Various towers are space frame structure. Bars are composed of single equilateral angle steel or combination of angle steel.
2. The materials are generally Q235, Q345 and Q420. The connection between the bars is crude bolt.
3. Hot dip galvanized anti-corrosion. Very convenient for transportation and construction erection.
4. We set foot nails on one of main legs to facilitate the construction workers to climb onto the tower for operation.


Qingdao Jiudingli Steel Structure Engineering Co., Ltd.
Qingdao Jiudingli Steel Structure Engineering Co., Ltd. was founded in 2003.The company is located in Jiaozhou City, Qingdao, Shandong Province, China.The company is mainly engaged in the production and manufacturing of solar bracket,transmission line towers,substation steel structures.communication towers etc


The company have production license
The company have production license of 500KV and 750KV transmission line tower,the whole series of communication,radio,television tower.The company have Steel Structure Professional Contracting Grade ll Qualification.We have exported more than 10 countries like USA, Mexico, Spain, Russia, india etcSolar photovoltaic brackets combined with solar cells can bring us very large energybenefits.
The transmission tower is the support point of the overhead line, and the erection of aloop on the transmission tower is a single-oop transmission tower, and the erection oftwo loops on the transmission tower is a double-oop transmission tower.



Why Choose Us




Certifications




Product packaging




FAQ


Q: How to pay?
A: T/T - 30% deposit in advance, 70% balance before shipment. Or L/C At sight.

Q: What is the delivery time?
A: Generally speaking, the delivery time will be within 15 - 35 days.

Q: How about your quality control?
A:We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to
accept any other the third inspection part to control.

Q: How to install?
A:We will provide detailed instruction photos and videos to you.If it is necessary,we will send professional engineers to do the
construction guidance, and some skilled workers to help installation.However, the visa fee,air tickets,accommodation, wages will
be borne by buyers.




1.1083 s.