Customized 304 stainless steel tanks, stainless steel storage tanks, stainless steel 3000L oil and food storage tanks

Share on (1601282950810):


Price:$4,200.00 - $5,999.00

Quantity:


Product Overview

Description





Customized 304 stainless steel tanks, stainless steel storage tanks, stainless steel 3000L oil and food storage tanks
3000L stainless steel storage tank is a high-quality storage equipment designed for large breweries, beverage production companies and food industries, designed to safely and efficiently store liquid raw materials and finished products. The storage tank is made of 304 or 316 stainless steel, which not only has excellent corrosion resistance and high temperature resistance, but also meets hygiene and safety standards to ensure that the internal liquid is not contaminated.
The tank body usually has good sealing performance, which can effectively prevent external air and impurities from entering, maintaining the freshness and quality of the contents. In addition, 3000L stainless steel storage tanks are often equipped with efficient temperature control systems that can monitor and adjust the storage environment to provide ideal storage conditions for sensitive substances.







Effective volume
3000L
1000L
1500L
2000L
2500L
3000L
4000L
5000L
Total volume
4250L
1250L
1875L
2500L
3125L
3750L
5000L
6250L
Size
960*2050mm
1160*2400mm
1260*2600mm
1460*2800mm
1700*3100mm
1750*3250mm
1800*3550mm
1900*4050mm
Material
SUS304/SUS316
Control system
PLC Siemens or PID Schneider/ABB brand
Work pressure
Internal Shell 0.2MPa; cooling jacket 0.3Mpa
Design pressure
Internal Shell 0.3MPa; cooling jacket 0.5Mpa




1. Bright tank is design with lifting ears for convenient hoisting equipment in place.
2. With rotating racking arm for beer delivery, which is convenient and flexible to deliver beer.
3. Specially designed dimpled cooling jackets outside to ensure heating and cooling efficiency
4. Bigger headspace, the cover headspace volume is calculated separately and extra.
5. Shadowless manway or top manhole according to the customer’s fermentation process and brewing types.
6. Jacket testing 12 hours with air and water, jacket testing pressure is 5Bar, internal shell testing pressure is 4Bar, and 48hours of water testing before packing.
7. Each fermentation tank will have its own pressure testing certificate and testing data show on tanks data plate;
8. Polished/Brushed/Mirror finish/Pickling passivation is optional
9, 60-degree cone angle for convenient for yeast excretion.
10 Equipping with special ladder for easy operation
11. All tanks are equipped with adjusting bolts to ensure the tanks are aligned and leveled.












LCL Shipping
1.The equipment will be covered by plastic film, then packed inside of wooden case!
2. Different parts will be packed in different wooden box for customers to find easily.
3. All tanks ports with a plastic cover to prevent dust.
4. The tanks and wooden case will be fixed inside the container by bolts and steel wires.




FCL shipping
1. Shipping department will work out the checking list with all that will be shipped.
2. Different parts will be packed in different wooden box for customers to find easily
3. All tanks ports with a plastic cover to prevent dust;
4.Tanks on cradle must be secured with bolts.
5. The cradle and tanks will be fixed inside the container by bolts and steel wires.
6. After shipping, we will have the completed loading pictures and checking list with all parts pictures provided to customers.





How you can guarantee your equipment quality?
Our quality, all our raw materials used are stainless steel 304 or 316 material, the plate is all perfect 3mm and 2mm, some manufacturers with low prices, but they are 2.7mm. Another importantly is all of our workers are from the South of China, which is famous for good workmanship.
Can you customize products according to customer requirements?
Yes, we support product customization.We are a factory, so you can tell our sales manager about the product requirements, and our engineers will design your own drawings for you.
How long does it take to get equipment?
Normally our production circle is from 30-50 working days depending on the order.
For the time being, from the day we get your deposit to the delivery we are looking at 90-150 days at your door delivery. Our leadtime will vary depending on our factory workload but we do like to keep honest leadtimes so there is no surprises except getting the equipment earlier that what it was suppose to.



0.1905 s.