Share on (1601283231684):




Notes: 1. Before construction, the wall or floor must be kept dry and not watered or rinsed. 2. The drier the walls and floors, the stronger the air permeability, and the better the liquefaction effect. 3. If walls and floors are peeling, shelling, or loose,they must be cleaned first. 4. Open the bucket and stir evenly, add water according to the relevant proportion according to the condition of the construction base surface, and then spray or roll on the base surface. 5. After the construction is completed,the construction surface will become harder and harder over time. |


New products from manufacturers at wholesale prices