Share on (1601296931714):
Our mobile asphalt batching plant adopts PLC programming controller and computer which can carry on the automatic and manual control of every part and every production process. Mobile asphalt batching plant features environmental friendly. The dust emission is less than 20 mg/Nm3 with no pollution to the environment.
Main features:
Introducing Germany Technology for the mixer, the mobile asphalt batching plant is widely applied to the construction of airport runway, port, road and bridge and they are the ideal equipment for emergency building of specialized road.
This equipment, with modular construction and compact design, is easy to install, transport and dismantle. It has the following mobile chassis:
1. Mobile Cold Aggregate Feeding System
2. Mobile Drum Dryer with Oil Burner
3. Mobile Mixing Tower
4. Mobile Bag House Dust Collector
5. Mobile Control Room with One Diesel Storage Tank
6. Mobile Bitumen Tank(Option)
7. Mobile Filler Storage and Supplying System(Option)
Mobile Cold Aggregate Feeding System The aggregate feeding hoppers and aggregate collecting belt are mounted on one mobile chassis. The belt feeder that adopts the frequency speed regulator has long speed range, so it runs smoothly and efficiently. Each discharging gate of hopper has an alarm for the warning of no aggregate in the bins. There is a vibrator on the wall of bin to avoid blockage. On the top of each hopper there is a screen to prevent the entry of bigger aggregate, ensuring the reliability of system. | Mobile Drum Dryer with Oil Burner The mobile drum dryer adopts 4 frictional wheels, which is drived by four synchronous motors. It runs smoothly with low noise. The temperature of the dried aggregate directly influences the temperature of the final product; Drying efficiency directly influences the consumption of the fuel, thereby the reasonable structure is very important. We fully absorbed the abroad advanced technology of mixing and got satisfying effect and realized the anticipated object. About the oil burner, we have international brand and domestic brand for you to choose. |
Mobile Mixing Tower The mixing tower includes the vibration screen, hot aggregate storage bin and weighing hopper, asphalt mixer, bitumen weighing, filler weighing(option). All these parts are mounted on one trailer chassis. Easy for installation and transferring to other worksite after you finished project in one place. The reducer for the mixer can be domestic brand or imported Germany NORD Brand. The weighing sensors can be Mettler Toledo, USA brand or Chinese Taiwan brand: Airtac. | Mobile Bag House Dust Collector This dust collecting system is equipped with primary gravity dust collector and secondary bag house dust collector. All the collected aggregate grain is conveyed to the hot aggregate elevator for recycling use. The secondary dust collecting system bag house dust collector. The bags adopt high temperature resistance material. It can work under rated high temperature,it has long life-span and good ventilation. The efficiency of dust collector can reach up to more than 99%,which fully meet environment protection standard. The collected filler can be recycling used. Of course, if you do not need, it can be discharged by screw conveyor. |
Mobile Bitumen Tank(Option)
| Mobile Control Room with One Diesel Storage Tank The electric control system adopts advanced electric components (including products of Siemens, Schneider or Omron) which ensures the reliability of long performance. According to the order of start, the driving control wire sets the protecting lines,thus guarantees the reliability and safety of operation. The motor of the belt feeder in the batching process is controlled by frequency speed regulator, so the regulation precision is improved. The control room and the diesel tank are mounted in the same chassis to make the full use of the chassis layout. |
Main parameters of SINOSUN mobile asphalt mixing plant:
Model | MAP1000 | MAP1300 | MAP1500 | MAP2000 | Remarks |
Total power | 215kw | 235kw | 340kw | 430kw | Standard configuration |
Capacity | 80T/H | 104T/H | 120T/H | 160T/H | 5% moisture |
Mixer Capacity | 1000kg | 1300kg | 1500kg | 2000kg | Rated |
Mixing period | 45s | ||||
Cold aggregate hopper quantities | 4 | 4/5 | |||
Fuel consumption | ≤6.5kg/T finished product | Light/heavy oil/Gas | |||
Finished product temperature(°C) | 140-180 | ||||
weighting precision | ±2.5% | Dynamic | |||
Air emission concentration | ≤20mg/Nm3 | NOMEX Bag filter | |||
Trailing speed | 40-100Km/h | Air brake System | |||
Trailer quantities | 5 units | (Excluding Bitumen tank,Filler silo) |
For over years, we supplied the asphalt industry with high quality asphalt batching plant parts, mobile asphalt mixing plant,continous asphalt mixing plant and other reletaed products.
Our asphalt plant products are cost effective, user friendly, easy to maintain and strong after - sales services.
Now these asphalt plant products have been widely used in home and abroad road construction project, such as Russia, USA,Thailand, Romania , Poland , Brazil , Philippines , Indonesia, Peru, Canada, Bangladesh etc. In Africa , we have exported to Ethiopia , Angola , Algeria and Libya etc.
About SINOSUN GROUP
SINOSUN is one of China’s dominant and professional manufacturers and exporters of Precisioned Asphalt Mixing Plants and related asphalt plant equipment.
We mainly supply:
1. Stationary Batch Mix Asphalt Plant (SAP series)
2. Recycle Asphalt Mixing Plant (SR series)
3. Mobile Batch Mix Asphalt Plant ( MAP series)
4. Continuous/Drum Mix Asphalt Plant (CAP series)
5. Bitumen Melting Machine / Bitumen Decanter(DT series)
6. Emulsion Bitumen Plant (RH series)
7. Burner For Asphalt Mixing Plant
Q:Which countries your equipment have been exported?
A:Thailand, Philippines, Indonesia, Myanmar, Russia, Bangladesh, Kazakhstan, Uzbekistan, Russia, Romania, Somalia, Kenya, Malawi, Nigeria, Togo, Mozambique, Oman, South Africa, America, Peru, Chile, Colombia, Venezuela, Australia, etc.
Q:How many workers are needed to operate one set of asphalt plant?
A:1 loader operator, 1 mechanical, 1 electrician, 1 supervisor ,1 the operator of the whole plant.
Q:How many days are used for installation of one set asphalt plant?
A:Around 20-30 days, according to local situation.
Q:Do you provide overseas erection and training service?
A:Yes, we can send experienced engineers to your country, guide erection and commissioning and train your workers how to operate the plant.
Q:How long is the delivery time?
A:30-40 days, according to different configuration. We promise to delivery on time.
Q:Can you sent me some spare parts freely?
A:Some spare parts will be sent to you together with asphalt plants freely.
Q:How to go to your asphalt plant factory easily?
A:Our city has airport. If by air, you can fly from Guangzhou/Beijing/Shanghai no more than 2 hours. Also you can fly to Zhengzhou, we send car to pick you up there.
Q:Can I visit your factory?
A:Of course. We warmly welcome you to visit our factory. And we provide you great services like airport pick up, hotel booking, etc.
Q:How long is the warranty of your asphalt plant?
A:12 months
Q:What payment terms you accept?
A:We accept T/T, L/C,D/A,D/P, Western Union, MoneyGram and other ways according to the practical situation.
Get the quotation of asphalt mixing plant, welcome contact us at any time.
Pls following us for more information of asphalt plant and related equipment.
New products from manufacturers at wholesale prices