Fashion A Grade Cotton Used Clothes Second hand Clothes Bales Of Used Old Clothing In Bulk Apparel In Stock Wholesale

Share on (1601302019515):


Price:$0.88-1.70

Quantity:


Product Overview

Description



Products Description




Type
Used Clothes Wholesale
Main Market
20 Countries of Africa: Nigeria, Angola, Cameroon, Benin, Togo, Gabon, Ghana, IvoryCoast, Liberia, Mozambique, Tanzania,
Kenya,Uganda, Zambia, Rwanda, Malawi, Burundi, Madagascar,Somalia,Gambia


6 Countries of Southeast Asia: Philippines, Malaysia, Cambodia, Indonesia, Vietnam,Thailand
Packing Size
45kg/65kg/75kg/80kg/90kg/100kg etc.
Packaging Film
Transparent(Waterproof) / White Woven Membrane / Orange Woven Membrane / Yellow Woven Membrane
Certificate
SGS / BV / BESC / Fumigation / Health / CNCA(Angola) / BIC
Shoe Type
Football Shoes, Sports Shoes,Soccer Shoes, Sneaker, Basketball Shoes, Slippers,Sandals,High Heel,Flat shoes,Leather Shoes,Hiking
Shoes
Payment
30% Deposit, 70% before Loading


Our Advantages




Features




Main Products




Why Choose Us




Main Market




Customer Feedback




FAQ


Q. Why choose DongTai for used clothing/used shoes/used bags?
A: 1)We have own factory, so we have very stable manufacturing capabilities. Our quality can be the best and price very competitive.
2)Quality control teams dedicated to their task monitor quality control measures at all facilities closely.
3)The price quoted according to your quantity. the quantity according to customer need.


Q:Are you factory or trading company?
A:We are manufacturer,the top leading in north China market. And we have our own trading team.


Q:How to make good quality?
A: 1st, material only from 1st level cities of China,like Shenyang, Shanghai, Beijing, Hangzhou, Jinan, and so on.
2nd,quality checking before off-loading the material, no good then reject.
3rd, we insist high standard from boss to workers.
4th,workers are skilled and stable for more than 3 years.
5th,5 QCs (quality control) are checking along the line all the time.


Q: How many days it cost u to produce one 40HQ container
A: 3/5 days per 40HQ container;10 lines working 28 days/month;over 50*40HQ containers/month.


0.1429 s.