Robot Painter Wall Plastering Machine Wall Render Equipment Automatic Wall Plaster Machine For Sale

Share on (1601304696936):


Price:$800.00-1,500.00

Quantity:


Product Overview

Description



Company Profile




Welcome to China Coal Group
Your Premier Destination for small road roller
This price is the deposit price for product production


Products Description




Wall mortar intelligent scraping robot, by the sensor, logic programmer, servo system, attitude adjustment mechanism, plastering robot arm and spatula and other components, 48V battery-powered, wheeled mobile, automatic correction of vertical and leveling, knife width of 1.3 meters, smoothing height of 3 meters, 4 meters, etc., with the use of mortar sprayer, you can quickly scrape the cement mortar on the wall, high efficiency, easy to operate.zmwm17




Product Paramenters




Name
parameters
Color
Yellow, green, blue, white
Voltage
DC48V
Power supply method
lithium iron phosphate battery
Standard battery capacity
35AH
Angle adjustment method
Sensor with electric cylinder
Parameter display and setting method
Touch Screen Monitor
Elevate the motor
DC48V0.75kw brushless servo motor
Braking method
Electric brake
Robot arm dimensions mm
242*120*18500
Host dimensions (L*W*H) mm
700*550*1050
Overall dimensions (L*W*H) mm
850*550*1920/895*550*192
Spatula length m
1.3 meters
Leveling height m
3m/4m
Total weight Kg
187/210
Package size and weight /3m
1050mm*660mm*2090mm/236kg
Package size and weight /4m
1100mm*660mm*2090mm/266kg


Details Images










Our Advantages










FAQ


1. You are a manufacturing factory or trading company?
China Coal Group is a manufacturing factory base of mines support equipment, transport equipment, lifting equipment, spray equipment, drilling equipment, ventilation equipment and other products.

2. Where is your factory located?
Currently we have one factories in China. One located in Jining, Shandong Province, China . You are warmly welcome to visit us at any time.

3. What are your main products?
We mainly produce mining machinery,road machinery and railway equipment. We can provide you with any machinery you need!

4. How long is the production leadtime?
Generally it is 15-20 days for goods in stock. In the case of out of stock or large orders, it will take 20-30 days. QTY of the orders will be taken into consideration.

5. What payment terms do you accept?
Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment), bank transfer, Paypal, L/C etc.

6. How do your quality control systems operate?
We have professional designer team, and employ experienced engineers to strictly guarantee the production. Meanwhile our factory owns ISO9001 and is CE and SGS certified.


0.1581 s.