Automatic Meat Production Line Sausage Production Line Mince Meat Production Line

Share on (1601317013920):


Price:

Quantity:


Product Overview

Description



Products Description




Specification


Device
Function
Capacity
Power
Meat Grinder
Grind Meat,Mince Meat
300-500kg/H
5.5KW
Meat Bowl Cutter
Emulsify Meat, Cutting Mince Meat To Be Meat Paste
20-30Kg/Once
5.5KW
Stuffing Mixing Machine
Mix Meat And Seasoning
150-200kg/H
33.5KW
Sausage Filling Machine
Filling Sausage
300-800Kg/H
7.1KW
Sausage tying machine
Sausage Tie A Knot In Same Distance
60 Times/Minute
6.5KW
Smoke Oven
Cooking, Fuming, Drying, Roasting Sausage
50-300Kg/H
15KW
Vacuum Packing Machine
Vacuum pack the sausage(for long Warranty Period )
50-300Kg/H
4KW


Details Images



    Meat Grinder


The meat grinder cuts and grinds large pieces of meat raw materials into small particles to prepare for subsequent processing.



    Chopper Mixer


The chopper can chop meat and auxiliary materials into minced meat or meat filling, and stir them thoroughly and evenly.


  
    Vacuum filling machine

The filling machine is used to mix and stir the ground meat processed by a meat grinder, chopper, or meat slicer with various seasoning ingredients.



    Sausage Stuffer Machine


The sausage stuffer machine is the core equipment in this stage. It fills the mixed meat filling into the casing, forming the shape of a sausage.




   Sausage tying machine


Tie the sausage into segments and divide them into fixed lengths.


    
    Smoke Oven
The automatic smoker is especially suitable for the production and processing of various chicken, meat, fish and other foods
and fruits.

All parts of the machine are made of SUS304 stainless steel, which has strong corrosion resistance



Vacuum packaging machine

The packaging machine packages the processed sausages to extend their shelf life and facilitate storage, transportation, and sales.


Company Profile










Customer Visit




Attend Exhibition




Packaging and Transportation




FAQ


Q1. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q2. How about your delivery time?
A: Generally, it will take 25-30days after receiving your advance payment. The specific delivery time depends on the items and
the quantity of your order.

Q3. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q4. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery




0.166 s.