Wholesale Hot Circuit Board PCBA Assembly Circuit Board PCBA Wholesale Price PCB Fabrication Assembly RF Power Supply Board

Share on (1601351317999):


Price:$4.00-5.50

Quantity:


Product Overview

Description



Product Description




Model Number
BLJ-PCBA-6
Place of Origin
Shanghai, China
Basic selling method
Sell by piece
Unit
Piece / Pieces
Supplier Type
EMS, OEM, ODM
Quotation Document
Bill of Materials, Gerber Files, Pick&Place File(XYRS)
Material
FR4 / Aluminum / Ceramic CEM1 / Copper
Copper Thickness
0.5~4oz
Immersion Gold
1U / 2U / 3U (normal) , 3U~25U (special)
Solder mask color
Blue / Green / Red / Black / White
Testing Service
AOI / X-Ray Function Test / FQC
Standard
IPC-A-610G
MOQ
No MOQ, Prototype PCB Assembly & Small Batch PCB Assembly & Wholesale PCBAs
Certificate
ROSH / ISO9001 / ISO13485
Other services
Box Build Assembly








Company Profile














Packing & Delivery






FAQ




Q1. Are you a factory or trade company?
Factory, we can provide one-stop turnkey PCB assembly and electronics manufacturing service.

Q2. What service do you have?
We provide turnkey solution including PCB design, components sourcing, software development, PCB assembly, enclosure design, finish product assembly and function testing.

Q3.What is needed for PCB & PCBA quotation?
For PCB:
Gerber file and technical requirements, including material, surface finish treatment, copper thickness and other special requirements.
For PCBA: BOM list, PCB /Gerber files, testing documents.

Q4: If we have no PCB /Gerber file, only PCB sample, can you make it for me?
Yes, we provide sample-based customization service.

Q5: Are my files safe?
All customer’s documents are never shared with any third parties. We are willing to sign NDA effect by customer side local law and promising to keep customers data in high confidential level.

Q6: How long does it take for PCBA quote?
Depend on project's complexity, normally 5-7 days are enough for us to evaluate.

Q7: What is your lead time?
Lead time is usually 5-10 days for PCB sample, 15-30 days for mass production. For some special situation, we will discuss with customer in advance to avoid any unexpected loss from customer side.

Q8: Do you have any MOQ requirement?
No, we can support your projects from prototype to mass production.




0.0863 s.