Application: Both E71T-11 and E71T-GS are gasless flux cored welding wires, which are used for welding sheet or thin gauge metal,
robotic / hard automation, general fabrication, especially suit outdoor and windy environment.
Difference: Accord with AWS requirement, E71T-GS don’t have requirements on the strength of welding joint. But generally, the difference is minimal.
Diameter: 0.8mm – 1.0mm Net weight: 0.5kg, 1kg, 5kg,
Why Choose Us
Quality & Engineering YOAO WELDING delivers consistent quality from our ISO9001 certificated manufacturing facilities that you can rely on every turn.Our application-spefic engineers and dedicated R&D team are able to tailor solutions for optimal performance and value.
About us
PROFESSIONAL WELDING EQUIPMENT MANUFACTURER SINCE 2013.
- Factory: shenzhen zhongliang WELDING EQUIPMENT CO., LTD - Address: Shenzhen, Guangdong Province, China - Number of Staffs: 60 ~100 people - Production Line: 5 lines - Production Capacity: 30,000 Units/month
PROFESSIONAL WELDING EQUIPMENT MANUFACTURER SINCE 2013.
- Annual Production Value: US$10 Million ~ US$15 Million.
- Export Year: 2013
- Export Percentage: 80%
- Annual Export Revenue: US$5 million ~US$10 million - Number of Foreign Sales: 10 people - INCOTERMS: FOB, CFR, CIF, DDP, DAP, EXW - Nearest Port: Shenzhen
PROFESSIONAL WELDING EQUIPMENT MANUFACTURER SINCE 2013.
- Average Lead Time: 35~ 45 working days
- R&D Center: SHENZHEN , CHENDU - R&D Capacity: OEM, ODM - R&D Experience: Solution for WORLD TOP 500 - R&D Device: Oscilloscope, Thermosat & Others - Number.of R&D Staff: 10 people
Certifications
Exhibition
Product packaging
FAQ
1. Q: Are you a factory or trading company ? A: We're a group company including 3 factories 。 YOAO is the professional manufacturer of producing welding machines and plasma cutter.
2. Q: Where is your factory located ? A: Our factory is located in Bao'an District Shenzhen city, 1 hour from Hong Kong airport or Shenzhen Beirailway station, 1.5 hour from Guangzhou Airpot.
3. Q: What certificates do you have ? A: We have gained the certificate of CE, EMC, ROHS, CSA, SAA and ISO9001.
4. Q: What's your delivery time ? A: Usually, it will take 35 days after we confirming the sales contract and details.
5. Q: What kind of payment terms do you accept ? A: T/T or L/C at sight.