Complete range of models Metal ore powder grinding machine Ore wet disc mill High manganese steel powder grinding machine

Share on (1601361658864):


Price:$2,842.48-2,869.81

Quantity:


Product Overview

Description



Products Description


Gold grinding machine
Gold milling machine is mainly used to select gold, silver, lead, zinc, iron, molybdenum, copper and antimony ores. All ores that can be selected by ball mill can be used by wet milling machine.

Through the stirring, rolling and crushing of raw materials, the rolling is repeated to achieve moisture balance, uniform ratio, low gas content, improve molding rate and molding quality. The products formed by the materials rolled by this machine have the characteristics of high density, good strength, no pores and heavy proportion.





Product Structure




Model
Specifications
Feed size
Speed ​​rpm
Delivery power
Weight
MB-900
900 × 150 × 60 × 250 ± 20mm
<20mm
16-18
2.2kw
1.8t
MB-1000
1000x200x80x 250±20mm
<30mm
13-15
5.5kw
4.5t
MB-1100
1100x200x80x 250±20mm
<30mm
17-19
7.5kw
5t
MB-1200
1200x200x80x 250±20mm
<30mm
17-19
15kw
5.5t
MB-1300
1300x250x150x 350±20mm
<30mm
16-18
25kw
6.5t
MB-1400
1400x250x150x 350±20mm
<30mm
16-18
18.5kw
7.5t
MB-1500
1500x300x200x 400±20mm
<30mm
20-22
30kw
12.2t
MB-1600
1600x400x200x 500±20mm
<30mm
20-22
30kw
15.5t


Application




Factory Pictures




Use site




FAQ




1. How does your factory do regarding quality control ?
Quality is priority. Our all products have to pass strict inspection and we will test the machine before delivery. Since the establishment of the factory, we always strictly require about the product quality, and gain high appreciate from our customers.

2. How about your after service?
One year guarantee. We shall supply free exchange for spare parts. And we also support online guidance for free if you have any questions.

3.How long does will take you to delivery ?
We will shipment within 15-20 days after receive your payment.
A. In stock, within 5 days after received the advance payment;
B. Out of stock, within 20 days after received the advance payment.

4.What 's the payment term your company accept ?
30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery.


0.1452 s.