winter highway repair cracks cold asphalt

Share on (1612699401):


Price:

Quantity:


Product Overview

Description


winter highway repair cracks cold asphalt 


 


1. All-weather cold Asphalt /cold bitumen    .    


2. Works in Water and ALL Weather Conditions .
3. Accepts Traffic Imme.


 


 


13.jpg 


 


 7.jpg


 


 


 


 

 



Product Description


 


 


 


Roadphalt all-weather cold paving material is a kind of high-tech road patching material, mixed and prepared by using Roadphalt high-performance cold paving additive, asphalt and aggregate according to certain processing technology, with an appearance of black grain-like solid, slight petroleum smell, insoluble in water, insensitive to motive impact and static electricity, and with stable properties.


 


 


5.jpg


 


 










































Prepaire area



pit depth



Recommendations mixture gradation



<0.3m



---------



AC-05 or AC-10



0.3-0.5 m2



3cm



AC-05



4-5cm



AC-10



6-7cm



AC-16



>0.5



2cm



AC-05



3-4cm



AC-10



5-6cm



AC-16



 


 


 


 


 


 


Comparison among cold paving asphalt, hot paving asphalt and emulsified asphalt


 


 














































































 Items



 


Roadphalt cold asphalt mixture


 



Hot paving asphalt mixture



Emulsified asphalt mixture



Construction seasons



 


 


Be constructed in all weather in a whole year, not influenced by winter or raining/snowing weather



Not constructed in low temperature winter and raining weather



The temperature is required not below 5°C, and the construction time is longer then the hot paving.



Holes/trench treatment



 


 


Just simple treatment, the holes/trench with gathered water can be filled directly 



Cleaning-up, removing gathered water, drying them up, and brushing with bonding oil are necessary 



Cleaning-up, shaping and removing gathered water are necessary 



Storage



 


 


The fill-bag sealed finished product can be stored as long as two years at room temperature



Can not be stored



Stored for 3-7 days or longer at 20°C 



Construction performance



 


 


Neither proficient workers nor special machines is needed



Proficient workers and special machines are needed



Proficient workers and special machines are needed



Production environment


 



 


 


Can be produced locally or pre-stirred in factory, without the smell of hot asphalt 



Stirring in factory is needed, with heavy smell of hot asphalt



Pre-stirring in factory is needed



Utilization rate of the material



 


 


Be taken at anytime if needed, and the left material can be used for next time.



The taken amount is more than the utilized amount, and the left material is invalid.



The material can not be used again after the emulsion breaks



Opening for the traffic



 


 


The traffic is opened immediately after the patching is finished.



The traffic is closed for a period after the patching is finished



The traffic is closed after the patching is finished, waiting for the emulsion to break.



Durability



 


 


The lifetime is as long as 10 years



Ordinary



Ordinary



Consume of energy



 


 


The stone materials are generally not required to be heated, and the temperature of asphalt is low, so the energy is saved.



the stone materials and asphalt are required to be heated



Amount of asphalt consumed is 10% less than that of the hot patching material, and the stone materials is not heated, and the temperature of asphalt is high.



Material consume 



 


 


Repeated repairs are reduced and material is saved; the shutdown cost caused by winter and raining weather is reduced



Waste is caused by taking larger amount of material to keep it warm; and the damage aggravates due to the patching can not be constructed at any time.



Generally the patching can be constructed in time, and the amount is taken according to the actual need. The cost on the shutdown of the construction and the machines is reduced to some extent. 



Social benefit



 


 


Patching is constructed at any time to maintain the pavement fresh all the time, which makes the traffic smooth, reduces traffic accidents and the patching times, and prolongs the serving life of the roads.



The patching can not be constructed at any time, which aggravates the impairment, influences the traffic, and reduces the serving life of the roads.



The patching time is a little long, which influences the traffic.



 


 


 


0.1847 s.