Pressurized solar water heater SIDITE

Share on (1622056503):


Price:RUB 22,480.78

Quantity:


Product Overview

Description

Pressurized solar water heater for use sunshine for shower/washing  

Working principle:

One copper coil is installed inside the tank as the heat exchanger. When water
flows into the copper coil.it absorbs the heat of the water in the tank via the
copper coil therefore the water tank is just a heat storage tank.
Working pressure: 6 bar.

 

Specifications:

1)Inner tank material: SUS304-2B Food grade with 1.2 mm thickness.
2) Outer tank: Titanium fluoride plate
3)a) Frame material:Galvanized steel plate with 1.5mm thickness

b) Frame material:aluminum alloy with 2.0mm thickness

c) Frame material: stainless steel 304 with 1.2mm thickness.
4) Material of heating preservation: 55mm Polyurethane.
5) a)vacuum tube dimensions: 58mm*1800mm

b)Vacuum Tube: tri-element tube;High boron and silicon content 3.3;Structure:Gradual change SS-AL-Nx/Cu selective absorption coating;Vacuum Degree:P<=5*10-4;

Service Life:15 years

6) water tank capacity: 100L-500L

7) Normal working pressure: 6 bar;

Test pressure: 12 bar

8) Heat preservation: 72hrs

9) Electric heater: 1.5 to 3kW

10 Dust Ring Gasket: Silicon Rubber

11) Rack Insert:ABS

 

1)Use in any time:It adopts
advanced design idea and integrates with high efficiency pre-heated patent
technique, so it can warm the cold water rapidly when it flows through special
pipe. it can overcome the demerit its of traditional SWH ,such as slow heating,
long waiting time.
2) More Capacity: We adopt special exchanging heat mode, it avoids mixed effect,
so cold water can be heated at any moment.
3) High hydraulic pressure: The hydraulic pressure is same as tap water, it is
very suitable for tired person.
4) Easy operation: It can supply water automatically, you can take it easy and
enjoy good time.
5) Economical and Environment protecting:There is no pollution when it is
working since it depends on sunshine,Green and economical
6) Fashionable: The appearance is fashionale and it can great integrate with
your fitment.

Can produce according to customer's designated requirements

6_01.jpg6_02.jpg6_03.jpg6_04.jpg6_05.jpg6_06.jpg

0.0817 s.