High Efficiency Biomass Energy Generator With Cogeneration System 1MW UK Original Engine Gas Generator(More than 80% efficiency)

Share on (1632060564):


Price:

Quantity:


Product Overview

Description


High Efficiency Biomass Energy Generator With Cogeneration System 1MW UK Original Engine Gas Generator

(More than 80% efficiency)

 

Product Description
 
QQ20140123101224.jpg
 

ENGINE DETAILS

Engine Model

4016-61TRS2

Rated Power(kW)

1042

Rated Speed (r/min)

1500

Type

60 ° Vee, 4 stroke

Cylinders

16

BorexStoke(mm)

160*190

Displacement (L)

61.123

Compression ratio

12:1

Fuel

Natural Gas

Fuel Consumption(NG) (kj/kWs) 100% load

2.53

Igniting system

Electronic-control spark plug ignition

Starting system

24VDC Electric motor

Induction system

Turbocharged, air to water charge cooled

Governor

Electronic

Net weight(kg)

6158

Dimensions (mm)(LXWXH)

1969*3192*1737

 

  

CHP System/Cogeneration System/Combined Heat and Power Generation 

 

         Cogeneration(also combined heat and power, CHP) is the use of a heat engineor a power station to simultaneously generate both electricity and useful heat. Thermal power stations, e.g. fueled by coal, and heat engines in general, can be installed with cogeneration systems. Those systems fail to convert all its thermal energies into power, and thus this proportion of waste heat can be utilized through CHP.

         Cogeneration on heat engines, (including those running on diesel, petroleum, and gas), recovers heat mostly from exhaust gas, jacket water, and sometimes from intercooler through heat exchangers. In this way, CHP can take place of standard cooling system of heat engines, like a fan radiator. It absorbs heat from the engines and converts it to either warm water (for household heating) or steam (for industrial boiler) depending on final applications.

 5.JPG1

 
Packaging & Shipping

  

Camda gas engine with cogeneration

Structures

Gas generator

Heat exchanger for exhaust gas

Heat exchanger for cooling water

Hydraulic systems (water pump, expansion tank, pipes)

 

CHP Drawing

50kw gas engine unit with cogeneration system

 

QQ20131127144524.jpgQQ20131127144611.jpg 

 

Our Services

  

Camda gas generator advantages

Gas Mixer

 

Electronic Air/Fuel Ratio mixer, better combustion and lower emission, sufficient combustion to reduce gas consumption and increase engine heat efficiency, effectively lessen NOX emission.
 
IMG_0030 

 

 USA Altronic Ignition System

Specially-designed air valves, crankshaft, camshaft, pistons, ignition system and combustion chamber according to international brands gas engine technology
 
P1020029 
 
Company Information

Company Profile

 

Camda established in 1998, located in Dong guan City, with a new industrial park covering 34000m2, dedicated system supplier of energy production,100MW installation capacity annually,anual sales revenue 680 million dollars.

 

Camda is a dedicated system supplier of energy production by diesel and gas powered generator set, waste treatment projects and solar energy. The company, based in Dongguan of Southern China, is basically a manufacturer of generator set for various kinds of fuel such as diesel, natural gas, biogas coal bed methane (CBM), associated gas and syngas. With decades of development and innovation, it has expanded its business to provide one-stop solution for waste treatment based on landfill, food waste, animal manure and waste water. Meanwhile, its pioneering in solar thermal power enables it to compete both at home and abroad.
 
factory02 Our
 
 
FAQ

  

 
Our Qualifications
 
Global International Qualifications:
 
Certificate of AAA Credit Grade Enterprise;
AAA Financial Grade Evaluation;
ISO9001:2008;
ISO14001;
ISO18001;
CE Certicate;
Global Manufacturer
by TUV, BV and SGS
 
CE-1 
 
 
Certificates 
 
Overseas Gas Power Plant Photos 
 
1. Biogas Generating-Kenya 
 
Model:KDGH120-G KDGH50-G Type: Biogas
Commission Time:Dec,2012      QTY:3 Sets
 
 01
 
 
2. Biogas power plant in UK
 
Equipment Supply:3X 120KW H series biogas generator set with CHP unit in Corby site are fixed on 3pcs 20GP Silent Container. 
Commission Time:Dec,2010      
Running Hour: 3250 hours
 
IMG_7447.JPGIMG_7448.JPGIMG_7457.JPG  
 

 



 

0.2032 s.