Sae4140 кованый квадратный цилиндрический стальной блок двигателя из нержавеющей стали

Share on (1838698166):


Price:

Quantity:


Product Overview

Description


 









HTB1O2xIHpXXXXaaapXXq6xXFXXXZ081301


Sae4140 AISI4140 Forged Shaft, Shaft Part Forging, Forging Shaft


Detailed Description:
1) Product Name: Forged Shaft, Shaft Forging
2) Material: 4130, 4140, 4317, 4142, 4340, UNS440, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 9Cr2Mo, 9Cr2W,


    9Cr3Mo, 60CrMoV etc.
3) Max weight: 60ton.
4) MOQ: 20ton.
5) FOB Port: Shanghai Port, China.
6) Delivery Time: 60ton in 30 days.
7) Delivery Condition: Rough Machined, Heat Treated, Fine Machined + EN10204: 3.1B
8) Payment: 30% T/T in advance, Balanced C.A.D.; or 100% L/C.


***


Mill Frequently Used Steel Materials:
1) Wind Power Shaft: 42CrMo4V, 34CrNiMo6; Wind Power Flange: S355NL, C22, 16Mn, 20Mn, 42CrMo, F304.
2) Forged Pipe Fittings: SA106 CL B, SA106 CL C, WB36, 12Cr1MoV, SA335 P11, P12, P22, P91, SA182         Gr.F1, Gr.F5, Gr.F11 CL2, Gr.F12 CL2, Gr.F22 CL3, SA350 Gr.LF1, Gr.LF2, Gr.LF3.
3) Pressure Vessel Forgings: SA105, SA350 LF2, 16Mn, 20MnMo, 15MnMo, 12Cr2Mo1, 14Cr1Mo, F304, F316, 17-4PH.
4) Shaft Related Forgings: 25CrMo4, 42CrMo4, 40CrNiMo, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 4130, 4140.
5) Gear Related Forgings: 35CrMo, 34CrMo4, 4137, 42CrMo, 4140, SCM440, 20CrMnMo, 40CrNiMo, 20CrNi2Mo, 20Cr2Ni4A, 34CrNi3Mo.
6) Copper Forgings: C10100, C10200, C10300, C10700, C12000, C12200.


 


Forging & Heat Treatment Equipment List


 










































































Name & DescriptionForging Handling Capacities   Quantity
6000 Tons Free Forging PressMax. Single Forging in 45 Tons
5000mm Diameter Rolling Forging Machine  Max. Single Forging in 16 Tons1
800 Tons Free Forging Press Max. Single Forging in 7.5 Tons 1
 60 Tons Forging Handling Operator  Max. Single Forging in 45 Tons  1
10 Tons Forging Handling Operator Max. Single Forging in 7.5 Tons   1
80 Tons Crane Max. Single Ingot in 80 Tons 
60/30 Tons Crane Max. Single Ingot in 60 Tons 1
30/10 Tons Crane 30/10 Tons 5
Trolley Heat Furnace 5000*1500*1200 mm  3
Trolley Heat Furnace 8000*2000*1600 mm  
Trolley Heat Furnace 6500*1500*1200 mm  
Vertical Heat Furnac Ø2500*10000 mm2
  Total Forging Equipment Quantity24            

 


Forging Production Flow




  1. Enquiry With Drawing In Details




  2. Confirm Steel Material, Chemical Compositions, Mechanical Properties, Tolerances




  3. Confirm Payment Terms, Order Materials or Check Material in Stock




  4. Check Material Chemical Compositions, Material Weight, Dimensions




  5. Cut Materials, Record Weight, Pre-Heating For Forging




  6. Forging Ratios, Heat Treatment After Forging, Dimension Check




  7. Rough Machining, UT Test, Heat Treatment




  8. Fine Machining, UT & PT Test, Dimensions Inspection, Mechanical Properties Test




  9. Customer Inspection at Site, Packing, Delivery Arrangement




  10. Balance Payment Confirmation, Dispatch Forgings or Castings




  11. Bill of Loading Confirmation, MTC Dispatch, Customs Clearances




  12. Order Accomplished!forging steel shaft forging steel shaft forging steel shaft






Packaging & Shipping


 delivery





Our Services


 


- OEM and ODM service is offered.


-Repair and engineering consult service is offered.


-One-stop service is offered from design, production and assembly to delivery.


-Export door to door delivery is offered usance L/C can be accepted.


-We have a profession sale team can provide 24 hours service with you. If you have needs, please feel free to contact me.





FAQ


Q: Are you trading company or manufacturer?


A: We are factory and trading company.


 


Q: How long is your delivery time?


A: Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.


 


Q: Do you provide samples ? is it free or extra?


A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


 


Q: What is your terms of payment?


A: Payment<=1000USD, 100% in advance. Payment>1000USD, 30% T/T in advance ,balance before shipment.


If you have another question, please feel free to contact us as below:


 


 


  Not exactly what you want? Post a quick Buying Request!




 


0.2119 s.