Лучший продавец ЦП проводящий термопаста пасты Halnziye hy510 трубки

Share on (1894566967):


Price:

Quantity:


Product Overview

Description


 


 

 



Product Description


 


 


Product Description


 


Thermal compound LED heat sink thermal paste heat conductive paste


 


 


Ideal for high power LED heat sink thermal conductive


these series are optimized for a wide range of bond lines between modern CPUs and high performance heat-sinks or air-cooling solutions.


pictures.jpg


HY510-1


 


 HY510-CN100 .jpgHY500-CN1000 2.jpg=HY510-ST100


 


 


HY500_05


LED (2)


 


Used for CPU and other electronics parts


 


Specification


 






































































Items



HY510



HY520



HY530



HY550



Unit 



Thermal conductivity



>1.93



>2.3



>2.5



>2.7 



W/m-K



Thermal Impedance



<0.225



<0.214



<0.126



<0.105 



°C-in2/W



Gravity



>2.4



>2.5



>2.63



>2.76



g/cm3



Viscosity 



1000



1000



1000



1000



No 



Thixotropic Index



380±10



350±10



320±10



300±10



1/10mm



Operation Temperature(Peak)



-30~240



-30~240



-30~240



-30~240



°C



 



-50~280



-50~280



-50~280



-50~280



°C



 


 


HY700_08


 

 



Packaging & Shipping


 


 HY700_09


 


 

 



Our Services


 


 


Our Service


1.Gurantee Period: 5 years


2.Express Door to Door Service


3.Payment:T/T Pay-pal Western Union


4.OEM&ODM


5.Products Exchange & Returns


(you should provide pictures or video or testing data to confirm that it is our products' problem)


 


 


Company Information


 


 


About US


 


 


We, Shenzhen Halnziye Electronics Co., Ltd. are senior Thermal Grease manufacturer in China for years, our main products are heat sink compounds & heat sink plaster & heat sink flow and thermal pad, our products are widely used in CPU&VGA, LED, IC etc, with great operating property of our products (all products got CE, RoHS certification), and our main markets are EU, north America, Northeast Asia, Southeast Asia etc, I believe you will find what you want to order with the best cost performance. 


 initpintu_


 

 



FAQ


 


 


FAQ


 


1>Lead time:


Less than or be equal to 1000pcs In 3 working days;other quantity depends on arranging of our factory.


2>Delivery period: 3~5 working by Express door to door service and airport to airport service, if by ship, it depends on schedule and destination.


3>All Emails will be answered in 12 hours, if you do not receive our reply,please send it again and we will reply as soon as possible.


4>Any other question ,no hesitate to contact us


0.2127 s.