lug cover making machine

Share on (228199576):


Price:

Quantity:


Product Overview

Description


 


Lug cap making machine


1.Technical Parameter


























Production capacity



100-150/minute



Applicable scope



three, four, six lugs



Motor power



53KW



Overall dimension



13800*5000*2300mm



Weight



12 tons



.


2. Production process:


(1)printed tinplate plate


(2)Material manually NC Punch(stamp cap)


(3)Conveying line


(4)cap making and injecting


(5)cap dryer


(6)Cap counter


___



Company Information


 


Jiujiang Gaoxin Metals Packing Mechanism Co., Ltd is one of the leading metal packaging machinery manufacturers in China.The range of machinery made in our company includes  cap making machines /production lines( aluminum caps,twist off /lug caps,EOE and other metal caps); can making machines /production line ( round,square and other shaped metal cans) ;NC punching machines;curling & sealing machines for capacitors,filters and other metal containers.Our company has strong technical force and provides to all the customers equipments' matched molds,spare parts,maintenance and technical support all along.


Our company is located in a place with perfect transportation conditions which is only about 2 kilometers to the Jiujiang High-speed railway station, 200 meters to Silver-Fu (Changjiu) freeway, less than one hundred kilometers to the Changbei International Airport.


Welcome to our company for business! We will provide satisfying products and service with good quality and competitive price for you!


2018





Our Services


 


1. Warranty: One year after shipment.


2. Delivery Time: 60-80 working days after receiving the advanced payment.


3.Power:3 phase 4 wire, 380V, 50Hz(or according to your requirements)


4. Installation and commissioning


Before installation,we will provide machine layout drawing with dimensions, total power, single power, power interface, water &air input and output position, total water consumption. After the machines arrived and have taken seat,you must connect the water and electric and air into the machines, then we shall send 2-3 technicians to install the production line.


CE


 


CE





0.2094 s.