CE stainless steel spigot lock stove chimney flue pipe

Share on (278157490):


Price:$40.00

Quantity:


Product Overview

Description


Product Description
\t
Product Name
\t
Double wall spigot lock system straight length
\t
Material
\t
SUS 304, SUS 430, Galvanized sheet
\t
Color
\t
stainless steel colour, color painted or powder coated, can be customized
\t
Standard
\t
EN 1856-1, UL103
\t
Certificate
\t
CE, Passed Certificate Accords to UL103
\t
Size
\t
5", 6", 7", 8", 10", 12"
\t
Thickness
\t
0.4mm-1.0mm
\t
Used
\t
Wood fireplaces, pellet fireplaces, stove, boiler, generator, heater chimney

Advantages:
1.Without thermal bridge, decrease heat transfer between inner wall and outer wall, keep a better insulation.
2. Spigot part and the chimney body is integrated, increase the strength of connection

Products Show
Our Products

Double Wall Twist Lock System

Includes: Straight Pipe, adjustable pipe, adaptor, elbow, Tee, Wall support base, Tee cap, Terminal.

Double Wall Spigot Lock System

 Includes: Straight pipe, elbow, adaptor, Base wall support, Tee, Fire stop, Rain cap 

Carbon Steel Flue Pipe

Includes: Straight pipe, bend with inspection door, adaptor, Trim plate, round bend.

Australian Galvanized Flue Kits

Includes: Single wall decorative casing powder coated, Single wall decorative casing powder coated, Drop box powder coated, Single wall straight pipe, Rain cowl, Decorative plate powder coated, Fixed Bracket GAL.

Single Wall Flue Pipe

Single wall: SUS304, stainless steel color or color coating

Accessories

1st line from left to right: Anti down draught cowl, Rain cap, Flexi top cap, Base wall support.
2nd line from left to right: Firestop, Roof support, Adaptor, Reducer.
3rd line from left to right: Adjustable wall bracket, Wall bracket, Tee plug with drain, Roof support.
4th line from left to right: Triangle bracket, Storm collar, Locking band for twist lock, Locking band for spigot lock

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Our Machinery
Mould

Plate Shearing

Lasar Cutting

Punching

Riveting 

SpotWelding

Our Certifications

                  CE Certificate                      Passed Certificate Accords to UL103                 Paten Certificate


Our Exhibition

Our Show Room

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally speaking one container needs 35-40 days for delivery.

Q: What is your terms of payment ?

A: T/T or LC. 
If you have another question, pls feel free to contact us as below:


0.1484 s.