Share on (303102252):
Equipment Elevation:
Specification:
| SJ25 | SJ30 | SJ35 | SJ45 | SJ50 | SJ65 |
Finished diameter | 0.1-1.8mm | 0.28-2.0mm | 0.4-3.0mm | 0.6-4.0mm | 0.6-5.0mm | 5.0-35mm |
Line speed (max.) | 150m/min | 180m/min | 180m/min | 150m/min | 150m/min | 80m/min |
Extrusion output (max.) | 8kg/h | 20kg/h | 25kg/h | 50kg/h | 60kg/h | 100kg/h |
L/D | 25:1 | 25:1 | 25:1 | 25:1 | 25:1 | 25:1 |
Extruder power | 4KW | 11KW | 11KW | 15KW | 15KW | 22KW |
Capstan wheel | Φ300 (belt type) | Φ300(belt type) or Φ191 (dual wheel) | Φ318 (dual wheel) | Φ400 (dual wheel) | Φ500 (dual wheel) | Caterpillar type |
Payoff reel | PN 200-300 | PN 200-300 | PN 300-400 | PN 400-500 | PN 400-630 | PN800-1250 |
Take-up reel | PN 200-400 | PN 300-400 | PN 300-400 | PN 400-630 | PN 500-630 | PN1000-1600 |




This machine can manufacture products such as below:



Q1: How long is the delivery time?
A1: It will take 20 days from the beginning to the end of the production
It takes more than 30 business days to customize complex mechanical equipment.
Q2:What is terms of payment? MOQ?
A2: T/T. 1 set.
Q3:How do you gurantee the machine stable operating?
A3:we do Pre-shipment test for every single piece of machine.
we have seperate QC,delivery,sales and after-sales departments.
also strict management process from pre-sales to after-sales.
Q4: How is your After-Sales Service?
A4:1 year warranty with 60+ oversea after-service engineers
(oversea after-service team of high efficient,professional and enough experience
for various Non-standard project)
Q5:How can I install my machine when it arrives?
A5: For simple and semi auto machine,DingLong would send manual instruction and teaching video.
For complex operation , we will send the engineers overseas to help client
installing, operating and training.
We have more than 15 years experience in making machines for cable, tube or strip. We are ISO9001 certified manufacturer, We promise one year guarantee period:within 12 months after commissioning , we provide damaged part for free- in- charge. but after 12 months, you should charge the fee for the spare parts.


New products from manufacturers at wholesale prices