Share on (315258037):
|
Standard |
ASTM A252 Gr1,Gr2,Gr3, SS400, |
||||
|
|
Or according to requirements |
|
|
|
|
|
Certificates |
ISO , |
|
|
|
|
|
|
API , |
|
|
|
|
|
|
Quality System Certificates , |
|
|
|
|
|
|
Environmental Management System Certificate |
|
|
|
|
|
|
The PRC Special Equipment Certification |
|
|
|
|
|
Manufacturing Method |
Cold Drawn |
|
|
|
|
|
|
Cold Rolled |
|
|
|
|
|
|
Hot rolled |
|
|
|
|
|
|
ERW |
|
|
|
|
|
|
SAW |
|
|
|
|
|
|
EFW |
|
|
|
|
|
|
LASW |
|
|
|
|
|
Applied for |
Structural pipe |
|
|
|
|
|
|
fluid pipe |
|
|
|
|
|
|
boiler pipe |
|
|
|
|
|
|
drill pipe |
|
|
|
|
|
|
oil and gas |
|
|
|
|
|
|
hydraulic pipe |
|
|
|
|
|
|
and so on |
|
|
|
|
|
Payment Terms |
1. T/T |
|
|
|
|
|
|
2. L/C at sight |
|
|
|
|
|
Delivery Time |
10-20days after the deposite |
|
|
|
|
|
Packing |
PP |
|
|
|
|
|
|
PE |
|
|
|
|
|
|
BUNDLE |
|
|
|
|
|
|
Caps both ends |
|
|
|
|
|
|
According to requirements |
|
|
|
|








New products from manufacturers at wholesale prices