Share on (437937388):
Blast Freezer Machine Tunnel Freezer IQF Freezer Industrial Freezer


Summary
The SSD series industrial tunnel blast quick freezers adopt stainless steel wire net belt or plastic net belt. According to different varieties, the products to be frozed can be put in the tray or directly on the conveying belt, and the rapidly frozen by the wind blowingfrom the top to the bottom or by the side wind. The quick-freezing machine of this model has the widest process range. It is suitable for various prepared foods(such as bun, dumpling, fish ball, etc.), seafood and especially varieties unsuitable for fluidized freezing. The optional range for freezing time is within 12~100mins.
Application
It has a wide application, is suitalbe for buns, dumplings, fish ball and other products.
Main technical parameters
Output±10%(kg/h): 300
Refrigerating capacity (kw):70
Freezer length (m): 8
Overall dimensions (m):10.4*3*2.5
Power required (kw) :21.2
Input material temperature (°c):+15
Output material temperature (°c): -18
the freezer temperature (°c): -36±2
Freezing time (min):12-100 continually adjustable
Refrigerant: R717/R22/R404A
Models
Model | Dimension (m) | Power required (kw) | Cold load consumption (kw) | Capacity(kg/h) |
SSD-100 | 8.5*2.8*2.5 | 10.3 | 22 | 100 |
SSD-200 | 10.5*2.8*2.7 | 11.0 | 40 | 200 |
SSD-250 | 10.5*3.1*2.7 | 14.2 | 50 | 250 |
SSD-300 | 12.0*3.3*2.7 | 15.4 | 65 | 300 |
SSD-400 | 13.0*3.3*2.7 | 20.2 | 90 | 400 |
SSD-500 | 14.0*3.3*2.7 | 20.6 | 115 | 500 |









Q1: Are you a factory or trading company?
A1: We are a manufacturer with self-support right of import and export. We have a professional team to
provide pre-sale and after-sale service.
Q2: Where is your factory? How can I visit your factory?
A2: Our factory is located in Shaoxing City, Zhejiang Province. It is near to Hangzhou Xiaoshan Airport
and Shanghai Hongqiao Airport. Warmly welcome you to our factory for a visit!
Q3: What’s the voltage of your machines?
A3: Normally 380V, 50HZ, 3Phases. Special demands can be customized.
Q4: What are the payment terms?
A4: We accept T/T and L/C.
Q5: What’s your advantage?
A5: (1) high quality and reasonable price;
(2) fast response and professional suggestion;
(3) integrated solution for food processing industry;
(4) we provide installation and training.
Q6: What is your Minimum quantity?
A6: MOQ is one set.
Q7: How long to deliver the products?
A7: It depends. Different machines take different manufacturing time. Normally 30-120 days. For urgent
order, it can be negotiable, please contact sales person.
New products from manufacturers at wholesale prices