Share on (50037029977):
250T Modular type jack-up barge
PRINCIPAL SPECIFICATION
| Jack-up General | |
|---|---|
| Class | ABS |
| Elevation Method | HYD, Cylindar |
| Pontoon (W2.4 * L12 * H2.5) / M = 10 CAN | |
| Pontoon (W2.4 * L6.0 * H2.5) / M = 8 CAN | |
| Spud Diameter * Length | ø1016 * 30M = 4 Piece |
| Max, Deck Road | 3Ton/m2 |
| Working Area | 300m2 |
| Jacking System | |
|---|---|
| Jackind Speed | 15m/hr |
| Jack Stroke | 1.28m |
| Max- Payload | 250ton |
| Engine hydraulic power | 280HP 2Unit |
| Generator | 100KW 1Unit |
| Mooring System | |
|---|---|
| Winch * 2 power | 7.5ton/ea * 1Drums |
| Anchor * 2 | 1.0ton stockless |
| Operating Conditions | |
|---|---|
| Max, Water depth | 22m |
| Wind velocity | 7m/sec |
| Max, Wave height | 1.0m |
| Current Velocity | 1.0m/sec |
| Air gap | 2.0m |













specipication
kind of lift / hydraulic
length / 12 metre
breadth / 12 metre
depth / 1.8 metre
class / south of korea / KST
MYUNG IL
Ever since its foundation in 1989, MYUNG IL Precision Machinery co., ltd. has continuously invested in R & D. In 1994, we have developed Mobile Tower Cranes, and from 1999, we have started supplying our own developed Self Elevating Platforms not only to the domestic buyers, but also to the foreign buyers in Russia, Kuwait, Mozambique, Indonesia and Angola.
Recently, we have applied for a Patent on the Anti-Weaving(Rolling) System for the Self elevating Platforms. Hence, our MOTTO, ‘The more we try to develop, the better quality products we can offer to our precious buyers.
Also raise the quality and price competitive products to respond to the rapidly changing YooYeong Tech co., ltd. signed a partnership with the world market in 2012. This will provide the lowest price to all customers with the best quality we promise.
Thank you very much
Marine plant
In the Yeongil Bay CO2 Injection Test promoted by the Ministry of Commerce, Industry, and Energy as part of the KOREA Carbon Dioxide Capture and Sequestration (CCS) project, Myung-Il Co.,Ltd is responsible for constructing a platform facility. After the completion of concept design in this year, we plan to complete working design and start production in the next year.
Lithium Absorption & Desorption Power Station
JACK-UP BARGE

New products from manufacturers at wholesale prices