China HICL HWB800 8000m3/h 32inch widely used hydraulic wheel bucket sand/mud suction dredger(CCS certificate) (50041929764)

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description


Product Description

 HTB11X8UKaSWBuNjSsrbq6y0mVXac.jpg18

HWB series dredger is large scale full hydraulic control, dismantled and re-assembled wheel bucket dredger, which is suitable for inland waterway dredging, ditches and reservoir dredging operations. The whole dredger adopts hydraulic and centralized control system. The main body consists of three pontoons, when used, it is spliced into a whole. The cabin is dismantled, which can lose height when through the limit height place such as bridge. When the dredger reaches the water no connected area, it can be dismantled and transports on long vehicles or trains. It is equipped with self-propeller, anchor  arm, spud devices & carrier, deck crane and so on. The bucket-wheel driving device adopt lubricating oil, and independent positioning metal floating ring seal.

 

 

Model No.

HWB800

Water Flow

8000m3/h

Max. Dredging Depth

17m

Discharge Distance

2500m

Dredger LOA

50.0m

Hull Size(LxWxH)

46.0x12.1x3.8m

Main Pontoon(LxWxH)

26.0x4.53.8m

Side Pontoon(LxWxH)

40.0x3.8x3.8m

Structure

Can be dismantled and re-assembled at work site

Main Engine

MAN/ 1720kw

Auxiliary Engine

Weichai/ 736kw

Harbour Generator

Weichai/ 103kw

Discharge Pipe Dia.

800mm

Average Draught

2.7m

Hydraulic Control System

Siemens PLC

Self-propeller

Optional

Spud carrier

Optional

Anchor arm

Optional

 

Company Information

 

Shanghai HICL Dredger Co., Ltd. is specialized in researching, manufacturing and selling large scale cutter suction dredger, wheel bucket dredger, jet suction dredger, bucket chain dredger, sand transportation ship, multi-function service work boat etc, which are widely used in sand-excavating, river dredging, desilting, reclamation for channels and land, port construction etc. All the products can be customized according to client’s requirement.

 

We have professional R&D department, CAD drawing design center, quality control department, after-sales service department, operating and purchasing department and product testing center. Our company has more than 200 employees, including 6 professional senior engineers on dredger building and researching, and more than 30 intermediate grade technical personnel. They specialize in designing and building dredgers and sand mining machinery. We have established a good cooperative relationship and signed co-operation agreement with a number of Ship Design Institute such as Jiangsu Ship Design Institute, Yancheng Ship Design Institute and Shanghai Ship Design Co., Ltd, etc..

 

In order to secure and develop new markets, we set up after-sales offices abroad. We have signed agreement with Domestic Provincial Port Authority, Waterway Dredging Department and River Authority. We have signed agency agreements with trade companies in following countries such as Malaysia, Indonesia, Bangladesh, India, Brazil, Argentina, Benin, Egypt, Poland, Nigeria, Ukraine, Iran, Saudi Arabia, Pakistan, and North Korea, etc. In recent years, our dredgers and gold mining equipment have been successfully exported to these countries.

 

On the principle of honest, mutual benefit and development, we warmly welcome customers home and abroad to visit our company and talk over with us.

 

Packaging & Shipping

 

-Dismantled for packing

-Packing in bulk for shipping

-Assembling at dredging site

 

Our Services

 

*Professional technician can be sent to service the machinery overseas.

*After-sales service department with 6 service engineers are available for 24 hours.

*Overseas after –sales service office build year by year.

*Real dredger in factory, customer visit factory any time.

*All dredgers test at launching site before delivery.

*Customer invite to see test at launching site. Video and pictures will email to buyer.

 

FAQ

 

Dredger Building

 

1, Material Purchase

*Checking the Business License and Registration Certificate of Suppliers.

*Using calipers to test the thickness of steel plate.

*Using sclerometer to test the hardness of the steel plate.

 

2, Pontoons Welding

*Using welding failure detector to inspect the welding quality.

 

3, Equipment Assembling

*All the equipments on the dredger should be well-know brand including   Cummins engine, Siemens PLC, Japan Yuken Hydraulic valve block.

*Using three dial gauges to adjust the concentricity of engine, gearbox and pump.

*All the electric lines are concealed wiring type.

*All the Hydraulic pipes are pickled three times.

 

4, Dredger Painting

*All HLC Dredger construction parts are of shot blasted plate with shop primer. Dredger after construction and assembly all rusty surfaces, welding spots and damaged shop primer will be cleaned and coated with primer.

*The painting of machine parts, readily supplied by third parties will be cleaned and touched -up in the original color. 

*Color scheme according to owner‘s specification.

 

5, No-load Test

* All the main equipments, including Engine, Gearbox, Pump,  Hydraulic  system.

* Electric system, are tested  for at least 2 hours in factory.

*All the suppliers of the main parts should be on the spot to solve any problem.

 

6, Dismounting and Packing

*All the parts are marked before dismounting.

*All the small parts are put into packaging box with a packing list.

* All the hydraulic pumps and pipes joints are packed  by plastic wrap.

*Every part ( no matter how small ) is registered on the packing list.

 

7, Delivery

* All the big parts are fixed in the containers by wires ,

* Before delivery, all the persons in charge should sign and make sure all the equipments are in good shape.

 

Dredger Launching Site is Available in our Shipyard 

In order to guarantee good performance and safety of our cutter suction dredger, all our products will be tested at the launching site before ex-factory, it is tested like the machine working in the customer’s working site. Performance and safety will be tested and recorded in the testing process. Usually, the buyer can also supervised the testing process before dismantle the dredge.

 

A. Preparing work before Dredger Testing

1)  Customers will be invited to watch dredger test , radio and pictures will email to buyers.

2)  Every parts and connections of dredger should be checked strictly before test. 

3)  Oil and cooling water should be ready for dredger test.

 

B. Dredger Test Contents 

1). Work condition of electricity connection of dredger should be checked .

2). Emergency pump to check operation conditions of hydraulic controlling system.

3). The speed and power of diesel engine should be tested 

4). Dredging pump will be tested and rotates at different speed with fresh water.

5). In order to check the operation of various hydraulic machinery and values, the main hydraulic pump will be opened and hydraulic system load performance should be tested.

 

C. After Testing   

1).  All equipment performances and testing recorded will be printed as report for customers' reference.

2). after testing, all work about dredger dismantle should be prepared and let customer knows when and what time will do the delivery.

 

Dredger Operation Training

*The Training of cutter suction dredger is the very basic and important role on dredgers. HICL provide a standard series training course as follow

*Basically introducing the main structure of HICL cutter suction dredger. 

*Mainly training classes on how to operate HICL cutter suction dredger, how to use Siemens PLC to control dredger work efficiently.

*Basically introducing the arrangement of engine room and attention matters in engine room. 

The main problems will occur during the dredger working process and how to avoid and fix them.

 

Dredger Commission in Worksite  

Dredger should be tested for running 24 hours after the complete installation. Dredger test includes:

*Operation of the sand /mud dredging

*Hydraulic and electrical system operating

*Running of the dredger’s outfitting equipment

 


50041929764
0.0384 s.