Односторонний падающий пленочный испаритель, вакуумный Испарительный концентратор

Share on (511399471):


Price:

Quantity:


Product Overview

Description



Products Description


Single effect falling film evaporator vacuum evaporation concentrator
Falling film evaporation is to add the material liquid from the upper tube box of the heating chamber of the falling film evaporator, and distribute it evenly into the heat exchange tubes through the liquid distribution and film forming device. Under the action of gravity, vacuum induction and air flow, it becomes a uniform film. Flow from top to bottom. During the flow process, it is heated and vaporized by the heating medium in the shell side. The generated steam and liquid phase enter the separation chamber of the evaporator. After the vapor and liquid are fully separated, the steam enters the condenser for condensation (single-effect operation) or enters the next-effect evaporator as The medium is heated to achieve multi-effect operation, and the liquid phase is discharged from the separation chamber.




Product Paramenters


Project
One effect evaporator
Condenser
/Material name
Alcohol solution
---
/PH value
/
---
Discharge method
First effect output
---
Total feed
300kg/h

Rated evaporation
200kg/h

Raw steam consumption
200kg/h(Saturated Vapor)

Steam consumption ratio
Each ton of water evaporated requires ≤1100kg steam

Raw steam temperature (℃)
105±2 vapor phase
---
Secondary steam temperature of each effect (℃)
70±2 vapor phase
70±2 vapor phase
Temperature of each effect material liquid (℃)
75±2vapor phase
45±2vapor phase
Vacuum degree of each effect (-MPa)
~0.05
~0.090
The boiling point of each effect material liquid increases (℃)
~5
---
Temperature loss of each effect (℃)
2
---
Heat loss of each effect (%)
0.08
---
Effective heat transfer temperature difference of each effect (℃)
30
---
Circulation type of each effect evaporator
Falling film circulation
---


Details Images






Company Profile


Wenzhou Chinz Machinery Co., Ltd. is a specialized high technology enterprise integrating the design, manufacture and service of biochemical pharmaceutical equipment, dairy food and beverage equipment, chemical equipment and sanitary fluid equipment. Our company is devoted to technology investment and culture construction. We have modern workshops and complete manufacturing
facilities. We absorb and train various talented people. We have one batch of capable, specialized and talented persons of design, manufacture and installment. Our company establishes a machinery R&D center, a fluid equipment machining and inspecting center and a machinery manufacturing center. After more than ten years of continuous development, our company has formed a troop of scientific and innovative team. Many of our products have obtained national invention patents.




Product packaging




FAQ


1. Q : How can customer know the processes of order?
A : We will take photo or video during manufacturing every two weeks to make customer clear about the order.
When goods is finished,we will take more detailed photos or video for inspect.
You can also come to our factory to inspect by yourself.

2. Q : Do you supply installation equipment in oversea?
A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing.
And you need to provides round-trip ticket and accommodation for our engineer.
The extra salary of one installation engineer is 200USD/day.

3. Q : How to control quality?
A : All material we use has material certification.
Before any piece of equipment leaves CHINZ.
It goes through a complete quality and assurance control inspection.
This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

4. Q : What is the shipment schedule?
A : We will send you photographs of your order being loaded into the shipping container at the factory.
The shipping container will generally leave port 3-4 days after loading.
We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container.
Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time.
Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company.
You will be directly contacted by the shipping company's local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time.
If you need to delay the final delivery, there will be a "pull" fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.






0.2037 s.