Share on (520074183):
Pickles Production Line,Pickles Processing Equipments


Application
SP-II Model Pickles Production Line,Pickles Processing Equipments are specially drsigned for pre-treatment of vegetables before drying.It is mainly composed of cleaning machine,sorting machine,cutting machine,blanching machine,cooling machine,drying machine,blending machine and etc.
It can be used for cleaning,sterilization,washing,blanching,color protection,cooling,water filtration and blending of various vegetables.With such features as simple operation,reasonable structure,convenient maintenance,wide application,and free combination of temperature and speed adjustment etc.,It is a special device of higher automatic degree.In addition to replacing heavy manual work,it also reduces high favor from users.The production line was awarded China Advanced Technology Second Prize an National New Product Prize in 1996.
Main features
Procedure
Freezing processing line
washing--cutting--blanching--normal temperature cooling--ice water cooling--vibrative draining--conveying and material spreading--IQF

Drying processing line
washing--cutting--blanching--normal temperature cooling--dewatering--drying

Workshop
vacuum freeze drying workshop

hot air drying workshop








Q1: Are you a factory or trading company?
A1: We are a manufacturer with self-support right of import and export. We have a professional team to
provide pre-sale and after-sale service.
Q2: Where is your factory? How can I visit your factory?
A2: Our factory is located in Shaoxing City, Zhejiang Province. It is near to Hangzhou Xiaoshan Airport
and Shanghai Hongqiao Airport. Warmly welcome you to our factory for a visit!
Q3: What’s the voltage of your machines?
A3: Normally 380V, 50HZ, 3Phases. Special demands can be customized.
Q4: What are the payment terms?
A4: We accept T/T and L/C.
Q5: What’s your advantage?
A5: (1) high quality and reasonable price;
(2) fast response and professional suggestion;
(3) integrated solution for food processing industry;
(4) we provide installation and training.
Q6: What is your Minimum quantity?
A6: MOQ is one set.
Q7: How long to deliver the products?
A7: It depends. Different machines take different manufacturing time. Normally 30-120 days. For urgent
order, it can be negotiable, please contact sales person.
New products from manufacturers at wholesale prices