Share on (530293342):
DP6800 Airless line striper, line marker

DP-6800 airless line striper (4HP 4.5L) with diaphragm pump is the preferred choice with line striping parking lots, athletic fields. It is ideal for most low to medium VOC, waterborne traffic paints. This is a great entry level Gas engine powered striper, and can be used for small to medium sized parking lots, runways, roads marking, paths and sports fields.
Features
1.Operator spraying controls are located right at the handle bars, designed for more comfortable and better control.You can fine tune the striping system operation without stopping
2.Provides easier “up to the curb” parking lot striping ,and With the Front wheel LOCK system, you can also stripe arcs and curves in any angle.
3.High-comfort design for greater striper control and less operator fatigue
4.Tall, low friction easy-roll wheels in big size, push easily for less operator fatigue.
5.Could be equipped with one gun spraying (standard) or two guns for double line spraying
6.The valves are precised machined in stainless steel + tungsten carbide material for long life.
7.Adjustable pressure control 0-3650psi / 250bar.
8.Powered by 4hp Honda GX160 Petrol Engine/Motor.
Technical data:
| Model No. | DP-6800 with diaphragm pump |
| Engine power | 4hp 3000Watts |
| Max. pumping capacity | 4.5 L/min (1.16GPM) |
| Max. nozzle size | up to 0,031″ |
| Max. pressure | 250bar / 3630psi |
Weight | 75kg (165 Lbs) |
airless road line marker, line striper, airless line marker

Q1:HOW LONG CAN I GET THE FEEDBACKS AFTER WE SENT THE INQUIRY?
Your inquiries will be replied within 1 working day.
Q2: WHAT’S THE PAYMENT TERM?
Sample order, 100% before shipment. Formal order, 30% deposit before production and 70% balance against copy of BL. Normally by T/T.
L/C at sight, Paypal, West Union is acceptable depends on the amount.
Q3:WHAT IS YOUR DELIVERY TIME?
Normally 7 days for the sample order, 25~35 days for the formal orders.
Q4:WHAT IS YOUR WARRANTY TERM?
1 Year warranty for main components(Easy damaged parts are not included.)
Q5:CAN I USE MY OWN LOGO AND DESIGN ON PRODUCTS?
OEM is available. The delivery time will be 35-50 days depend on order quantity and the MOQ will be different based on different models.
Q6: CAN I CHECK THE QUALITY OF GOODS BEFORE DELIVERY?
A:You can come to our factory or ask colleagues from your Chinese office or a third party inspection company to check the quality of goods before delivery.
B:We also can provide inspection report to you before shipping.
New products from manufacturers at wholesale prices